this task
1. Based on the SCRUM design task completed by the previous group as the background, draw up a virtual SQA plan for the software development task.
2. Compile the acceptance test procedures for the SCRUM design tasks completed by the previous group.
SQA Program
- Software Engineering: (to be edited)
- Quality assurance:
- Quality Control:
- Data collection:
5. Statistical report:
Acceptance Test Procedure
1. Test analysis: (to be edited)
2. Test case:
The program Github address is: https://github.com/CindyICE/LIFE-IN-CHANGDA