problem:

1, the lack of timely and effective communication between the testing, development, product.

2, the lack of definition of the standard line.

3, the test time is short, the shortage of staff.

 

ways to improve:

1, after the product demand out tests need to press the demand to write test cases, test, development, product use cases together to review and confirmation.

2, during the test, the test needs to be common types of tests (typically comprising: a functional test, the user experience testing, weak network testing, compatibility testing, performance testing).

3, every day, severity and status of the test statistics will be issued prior to the BUG version of the distribution, and lists the list of serious problems BUG, ​​and then copied to the development of products, so that they understand the situation of modified products BUG.

4, before the hair version every day, testers need to track the progress of the development of BUG fix, fix the problem if the development is relatively slow, the need for timely communication and coordination with development, tracking the progress of the development of problem-solving.

5, release criteria, such as (all functions according to the needs of implementation issues test found have been closed, BUG main flow does not occur, the number of BUG over the severity of 0, low levels of several BUG <= 5 Ge, execute test cases have been completed).

6, each release content (install package files, SQL scripts, documentation, etc.) related to the version required by the corresponding version put on SVN, and explain what the environment is part of the package (testing, pre-release, officially).

7, the front end (android and IOS) release version, include a version number, a time stamp value MD5 package files, the package of files, the package corresponding to the file to be uploaded to SVN.

8, before the release, need to go through acceptance testing, general product manager needs to intervene acceptance testing, product acceptance by the test press release criteria to determine whether the line.

9, before the release, issued in line with the standard version, and tested after the release of version send mail notification, before starting the release operation, development and testing need to be made to assist the operation and maintenance Edition operating.