BOM virtual items and virtual material explanation

BOM virtual items and virtual material explanation

Author: Yuan Yunfei (AlbertYuan) - Micro Signal yuanalbert

The following are original, hope to have some supporting role for beginners, I mainly engaged in related work MM / QM / WM and unprofessional Department asked a lot of guidance, full of dry goods, the code word is not easy, 且行且珍惜, your attention is me power effort, reprint please cite the source, grateful;

It can be defined in the material master file records in a project as a virtual member. MRP for the Phantom does not generate planned orders, but to expand its bill of materials directly to the next level.

Unlike virtual semi-finished materials, it does not specify the form, or is not a true sense of the material.

For example, computer products often contain instructions manual, warranty card, CD-ROM drive, etc., these things are relatively common but little change over time, it can be combined into a "virtual material" to facilitate the entry and management. Therefore, virtual materials also need to create a BOM.

To create a virtual material, the material master "MRP2" column, shall "special procurement type" is set to 50 (nothingness assembly). "Accounting 1" column, the "assessment level" is set to 8000. (Phantom).
Here Insert Picture Description
Virtual stock material is actually non-existent bill of materials (BOM) of sub-assembly. It is used to simplify the BOM. Although virtual materials appear in the material list, but the production orders will display virtual components needed to manufacture the material, rather than the virtual material itself.

The following BOM diagram contains two virtual materials.

Material Requirements Planning

Material Requirements Planning will launch a virtual material, and creates recommendations for its components. Virtual materials will be displayed in the results window material requirements planning, without any suggestions for reference purposes only.

Production Order

Production orders will start virtual BOM, according to the order needs to display its components. In the following example, the components in the production order occurs 1-6, instead of the virtual 1 and 2.
Here Insert Picture Description
The same company in different departments of a single material requirements may vary. Engineering department may need to create multi-level BOM to define the engine. And this might Production BOM as a single virtual material included.

The above is the entire contents of this chapter, we want to help small partners;

Published 151 original articles · won praise 2 · views 10000 +

Guess you like

Origin blog.csdn.net/weixin_44853659/article/details/104746123