Group 11 Beta sprint (5/5)

Team Name

What team do not know

Leader blog

https://www.cnblogs.com/xxylac/p/12031050.html

Job blog

https://edu.cnblogs.com/campus/fzu/SE_FZU_1917_K/homework/10092

Project Status

Burndown (band request date)

img

Chen Zheng Hua (Leader)

1. What are the last two days to complete the task:

  1. urge workers, strange pressure

  2. all the details of tinkering

2. The next program

  1. Test

  2. Modify the bug

3. What task left

  1. Test

  2. Modify the bug

4. What are the difficulties

  No

5. Harvest and questions

  No

Li Zhenping

1. What are the last two days to complete the task:

  1. The various details of tinkering

2. The next program

  1. Test

3. What task left

  1. Test

4. What are the difficulties

  Write code did not comment. . .

5. Harvest and questions

  flex layout of learning

Shen Yu

1. What are the last two days to complete the task:
  1. Complete the template Get Interface

  2. installed cdn

2. The next program
  1. Test

  2. Optimize the interface performance
3. Which left the task
  No
4. What are the difficulties
  No
5. harvested and questions
  cdn so fast. .

Chen Yi

1. What are the last two days to complete the task:

  1. The various details of tinkering

  2. Test

2. The next program

  1.debug

3. What task left

  1.debug

4. What are the difficulties

  No

5. Harvest and questions

   No

Wang Zehong

1. What are the last two days to complete the task:

  1. Test

2. The next program

  1. Test

3. What task left

  No

4. What are the difficulties

  Time is running out

5. Harvest and questions

  No

Lin Wei Zheng

1. What are the last two days to complete the task:

  1. Test

2. The next program

  test

3. What task left

  test

4. What are the difficulties

  no

5. Harvest and questions

  no

Lin Yun-chuan

1. What are the last two days to complete the task:

  1. Test

2. The next program

  1. Test

3. What task left

  No

4. What are the difficulties

  For some color with a very fans

5. Harvest and questions

  Use a color wheel

Chen Jiawen

1. What are the last two days to complete the task:

  1.git use of learning

2. The next program

  Continue studying

3. What task left

  no

4. What are the difficulties

  Code is too bad, programming section not help

5. Harvest and questions

  Baidu continues to face learning

Wang Shi-ting

1. What are the last two days to complete the task:

  1.git use of learning

2. The next program

  Continue studying

3. What task left

  no

4. What are the difficulties

  1. multiplayer cooperative projects could not participate because of the strength of many

  2. The use of technology and other aspects are not familiar with

5. Harvest and questions

  1. Harvest: not understand the problem through Baidu to know, there is a deeper impression

  2. question: Programming is not familiar with the technical aspects

Latest results

img

img

img

Standup photo

img

N-meeting Consuming (minutes)
1 7
2 8
3 5
4 7
5 8

Personal PSP

PSP2.1 Personal Software Process Stages Estimated time consuming (minutes) The actual time-consuming (minutes)
Planning plan 10 10
·Estimate • Estimate how much time this task requires 10 0
Development Develop 50 60
·Analysis · Needs analysis (including learning new technologies) 60 60
·Design Spec Generate design documents 60 60
·Design Review · Design Review 0 0
·Coding Standard · Code specifications (development of appropriate norms for the current development) 0 0
·Coding · Specific coding 120 150
·Code Review · Code Review 30 30
·Test · Test (self-test, modify the code, submit modifications) 0 0
Reporting report 60 70
· Test repor ·testing report 0 0
·Size Measurement · Computing workload 1 1
·Postmortem & Process Improvement Plan · Hindsight, and propose process improvement plan 0 0
total 401 441
N-Week New Code (lines) Cumulative codes (lines) This week learning time-consuming (hours) Cumulative learning time-consuming (hours) Important growth
1 0 0 24 24 Preliminary master Axure Rp usage
2 300 300 10 34 The idea of ​​AI algorithms to complete thirteen water
3 300 600 15 49 Brainstorm a team project topics
4 1200 1900 15 64 Learn to analyze project requirements j
5 0 1900 5 69 For the actual programming carried out in advance of learning
6 500 2400 10 79 For a deeper understanding of the project team!
7 300 2700 5 84 Assignments
8 100 2800 5 89 no
9 200 3000 7 96 Front and rear side interaction
10 200 3200 7 103 no
11 300 3500 8 111 no
12 700 4200 12 123 promise of Use
13 200 4400 5 128 no
14 200 4600 5 133 canvas