Team Name
What team do not know
Leader blog
https://www.cnblogs.com/xxylac/p/11997386.html
Job blog
https://edu.cnblogs.com/campus/fzu/SE_FZU_1917_K/homework/10089
Project Status
Burndown
Chen Zheng Hua (Leader)
1. What are the last two days to complete the task:
1. urge workers, strange pressure
2. The front end module production process Canvas
3. get SSL certificates and domain name
4,code review
2. The next program
1. Complete production module
2. Learn about the canvas
3. What task left
1. Complete production module
4. What are the difficulties
1. The previous projects have not used canvas
5. Harvest and questions
1. Learn to use the canvas
Shen Yu
1. Complete the search interface
1. Optimize the performance of the interface
3. Which left the task
No
4. What are the difficulties
flask multithreaded but forget to lock the
5. harvest and questions
thread and thread lock to learn
Li Zhenping
1. What are the last two days to complete the task:
1. improve the front page of favorites
2. docking interface and back-end collections
2. The next program
1. improve the function Favorites
2. Favorite curd filling into the front-end interface
3. What task left
1. improve the function Favorites
2. Favorite curd filling into the front-end interface
4. What are the difficulties
Before the code amount is too small, there is no plan to write the code, improve code quality still
5. Harvest and questions
And to understand the difference between synchronous and asynchronous difference JS
Chen Yi
1. What are the last two days to complete the task:
1. Modify the home of some style
2. Home of code components of (a collection of pop-up box integration as a component uses)
2. The next program
1. improve the reporting function of page
3. What task left
1. improve the reporting function of page
4. What are the difficulties
No
5. Harvest and questions
2.mvc framework of principles and mvvm
Wang Zehong
1. What are the last two days to complete the task:
1. Complete the reporting interface
2. Understand the ngnix configuration
2. The next program
Continue to complete Interface
3. What task left
Continue to complete Interface
4. What are the difficulties
Time is running out
5. Harvest and questions
Harvest: Understanding the difference between http and https in
Lin Wei Zheng
1. What are the last two days to complete the task:
1. Assist the head of the back-end interface to complete the preparation
2. The next program
Write interface
3. What task left
Write interface
4. What are the difficulties
no
5. Harvest and questions
no
Lin Yun-chuan
1. What are the last two days to complete the task:
1. Edit ui interface design
2. The next program
1. Assistance to improve front-end design of the page
3. What task left
No
4. What are the difficulties
For some color with a very fans
5. Harvest and questions
Use a color wheel
Chen Jiawen
1. What are the last two days to complete the task:
1.git use of learning
2. The next program
Continue studying
3. What task left
no
4. What are the difficulties
Code is too bad, programming section not help
5. Harvest and questions
Baidu continues to face learning
Wang Shi-ting
1. What are the last two days to complete the task:
1.git use of learning
2. The next program
Continue studying
3. What task left
no
4. What are the difficulties
1. multiplayer cooperative projects could not participate because of the strength of many
2. The use of technology and other aspects are not familiar with
5. Harvest and questions
1. Harvest: not understand the problem through Baidu to know, there is a deeper impression
2. question: Programming is not familiar with the technical aspects
Latest results
Standup photo
N-meeting |
Consuming (minutes) |
1 |
7 |
2 |
8 |
|
|
|
Personal PSP
PSP2.1 | Personal Software Process Stages | Estimated time consuming (minutes) | The actual time-consuming (minutes) |
---|---|---|---|
Planning | plan | 10 | 10 |
·Estimate | • Estimate how much time this task requires | 10 | 0 |
Development | Develop | 50 | 60 |
·Analysis | · Needs analysis (including learning new technologies) | 60 | 60 |
·Design Spec | Generate design documents | 60 | 60 |
·Design Review | · Design Review | 0 | 0 |
·Coding Standard | · Code specifications (development of appropriate norms for the current development) | 0 | 0 |
·Coding | · Specific coding | 120 | 150 |
·Code Review | · Code Review | 30 | 30 |
·Test | · Test (self-test, modify the code, submit modifications) | 0 | 0 |
Reporting | report | 60 | 70 |
· Test repor | ·testing report | 0 | 0 |
·Size Measurement | · Computing workload | 1 | 1 |
·Postmortem & Process Improvement Plan | · Hindsight, and propose process improvement plan | 0 | 0 |
total | 401 | 441 |
N-Week | New Code (lines) | Cumulative codes (lines) | This week learning time-consuming (hours) | Cumulative learning time-consuming (hours) | Important growth |
---|---|---|---|---|---|
1 | 0 | 0 | 24 | 24 | Preliminary master Axure Rp usage |
2 | 300 | 300 | 10 | 34 | The idea of AI algorithms to complete thirteen water |
3 | 300 | 600 | 15 | 49 | Brainstorm a team project topics |
4 | 1200 | 1900 | 15 | 64 | Learn to analyze project requirements j |
5 | 0 | 1900 | 5 | 69 | For the actual programming carried out in advance of learning |
6 | 500 | 2400 | 10 | 79 | For a deeper understanding of the project team! |
7 | 300 | 2700 | 5 | 84 | 分配任务 |
8 | 100 | 2800 | 5 | 89 | 无 |
9 | 200 | 3000 | 7 | 96 | 前后端交互 |
10 | 200 | 3200 | 7 | 103 | 无 |
11 | 300 | 3500 | 8 | 111 | 无 |
12 | 700 | 4200 | 12 | 123 | promise的使用 |
13 | 200 | 4400 | 5 | 128 | 无 |
14 | 200 | 4600 | 5 | 133 | canvas |