ASE19 beta stage model project team record set scrum6

The meeting, 19:30 Microsoft Beijing West the second floor sky garden was held on December 6, for 20 minutes.

Participants: Jiyan He, Lei Chai, Linfeng Qi, Xueqing Wu, Kun Yan, Yutong Lin, Jingwei Yi (Zhipeng Huang leave)

1. Each person's work:

Person's name done to do
Hav Communicate with back-end data butt Continue to interface with back-end data communication
Kun Yan Recommended system design optimization Continue to optimize system design recommendation
Lei Chai Reconstruction codes; NLP model integrated filtering and sorting search results, improved systems hint :: www Continue to integrate NLP model filter and sort search results
Linfeng Qi Input and output interface design Continued input and output interface design
Xueqing Wu Scrum Report 5 Scrum Report 6
Yutong Ling Design unittest Continue to design unittest
Jie Pan FIG abutting front and rear ends with a radar FIG abutting front and rear ends with a radar
Zhipeng Huang Improved hint :: neural so as not to depend on AST
Jingwei Yi Completion data crawling Data cleaning, model training

2. The difficulties encountered in the work

No

3. burndown

4. The daily meetings photos

The recording code embedded

No

Guess you like

Origin www.cnblogs.com/jennawu/p/12013672.html