The fourth group project summary (prototype)

The fourth group project summary (prototype) 

Related Links:

Blade prototype link: https://pan.baidu.com/s/1qrVI_je8NONVHT_FwH6Pwg

UML design link (included with the first meeting summary):    https://www.cnblogs.com/lfxy/p/11885545.html

Requirements Document Link: https://www.cnblogs.com/lfxy/p/11788767.html

Two weeks personnel division:

Cai Binbin:

UI interface demo complex and important functions to achieve: the bottom navibar, scroll pages, tabs

Page write: Home, community view pages, community home page (unfinished), my page, the management page)

Huang Ye Branch:

Page write (registration page, individual centers, message box, page browsing activity, application activity, page switching animation),

Audit and for all the UI function for writing to the UI interface integration (the super-hard)

Jump logical page design

Design button click event

The final confirmation page and modify details

Establish a connection to a database

Database interface and written confirmation

Write database performance function

Huang Yi Han:

Written page (login page, create community pages, community pages)

All UI interface layout, design and landscaping details of modifications

This document writing

Difficulties in implementation (carousel pictures, pictures round, transition animation)

Database Interface confirm

Wang Jingping :

Page write (login prompt registration page, community activities review page, create a page, event page search, community search page)

Document write

Database performance function to achieve

The second meeting summary - November 23, 2019

I. Organization of the session

Meeting reason: because the prototype is expected to keep up with progress, interim decided to meet on Saturday

Meeting time: 9:00 - 16:00

Meeting: 1. to discuss the progress of this stage

                  2. Confirm that you want to finish the work what? And a clear division of labor

                 3. Recognizing that some individuals can not decide the issue

3.4. Put forward their demands on others

                 5. Together to write code and mutual supervision, improve efficiency

Second, the current process

  1. Cai Binbin ui prototype confirmed
  2. Blade prototype has been completed
  3. Ui coding methods section members have been learning
  4. Interface has confirmed that the performance function has been completed

Third, the demand record

  1. Cai Binbin be made only function to achieve, roughly the page layout, detail page layout, landscaping and handed Huang Yi-han responsible
  2. Yellow Branch Ye write ui (registration page, individual centers) general framework, Huang Yi Han and Wang Jingping by the use of the framework to implement other simple interface

  Section 3. Huang Ye need for everyone to review and eventually integrated interface

Fourth, the working day:

  1. Huang Yi-han confirm the details of the system environment

    a) a virtual machine environment: pixel 3a (android 9.0 pie)

    b) Software Resolution: 2220x1080

  1. Cai Binbin continue UI functions to achieve
  2. Yellow Branch Ye write register page demo day, providing members with reference to learning
  3. Wang Jingping UI learning to write textbooks
  4. Huang Yi-han collect, edit, and upload the software to use the logo file

          Software logo with the urgent need to upload Logo

Prototype display

First, the    first version of the prototype (November 23)

Completed interface: home, community pages, registration pages, personal pages Center

Completed functions:

1. The      sliding function implemented '

2. The     bottom navibar achieve

3.     Search Box to achieve

unfinished:

1.      layout (subsequent ongoing)

2.     Carousel FIG (subsequent realized)

3.     Tab (follow-up has been achieved)

4.     Image round (subsequent realized)

5 , picture fillet (follow-up is not possible, consider giving up)

Second,     Second Edition prototype ( 11 Yue 30 days)

Login registration page

  

 

我的主页、社团页、管理页、我的页面、个人中心

  

 

由于页面过多,就展示这些了

三、数据库连接部分

仅连接了注册与登录页面,还有部分活动

现阶段仍存在的问题:

1.      部分页面排版仍未完成

2.     图片圆角还未实现

3.     函数错误信息仍未能提示

4.     社团主页仍未完成

5.     数据库与前端的连接尚在初步,需要加紧进度

Guess you like

Origin www.cnblogs.com/lfxy/p/11973849.html
Recommended