Team name: eleven calves
Leader blog: click here
Job blog: Alpha sprint (6/6)
1. Each crew case
Yang rain (Leader)
- Over the past two days to complete the task which
- Alpha sprint organized last meeting
- Alpha follow the final sprint stage small program to help small program completed
- Arrangements blog comments ratings
- Saturday schedule tasks reply
- Code GitHub day / document check-in recording ( the shared group )
- The next plan
- Alpha sprint to complete the respondent and relevant blog
- Beta ready to sprint
- The remaining task
- FIG burn ( in the group share )
- FIG burn ( in the group share )
- problems at hand
- Less time to prepare, prepare Saturday's task a little hurry to reply
- Harvesting and questions
- Harvest: Alpha sprint to complete the task
- Question: How quickly ready Saturday to reply?
Lin Yuhao
- Over the past two days to complete the task which
- Increase access to micro-channel user name and avatar
- Increase collectively form a single fight
- Full-page bottom navigation bar button
- The current state does not fight alone would prompt
- The next plan
- Complete the remaining interface and functionality
- Beta ready to sprint
- Which left the task
- Personal information interface
- Students certified interface
- Perfect interface
- problems at hand
- Time is tight, small program completed was not very good
- Harvesting and questions
- Harvest: The main function of most pages and completed the applet
- Question: None
To Jie
- Over the past two days to complete the task which
- Video clips begin. Preparing for the respondent
- The next plan
- Completion and production of a video clip
- Saturday ready reply
- Which left the task
- Complete and perfect video
- problems at hand
- Cut video technique is not mature enough, cut out of the video may not be very good
- Harvesting and questions
- Harvest: cut video techniques better use of the
- Question: how best to cut a better video faster?
Zhu Yue Xuan
- Over the past two days to complete the task which
- Video clips, to prepare for the defense
- The next plan
- Sound clips and video production
- Alpha sprint to complete the task of reply
- Which left the task
- Modify perfect video
- problems at hand
- The video cut more slowly, complete content was not very good
- Harvesting and questions
- Harvest: The more skilled a video clip
- Question: There are a lot of skills have not learned, the time to learn again
Lee vanadium effect
- Over the past two days to complete the task which
- Perfect applet page
- Saturday mission to prepare defense
- The next plan
- The remaining pages and functionality to help complete
- Beta ready to sprint
- Which left the task
- Optimized code, complete applet
- Beta sprint
- problems at hand
- Improve the process went smoothly, occasionally stuck some small problems, but also to learn a lot of operations
- Harvesting and questions
- Harvest: The applet development operations increasingly skilled
- Question: how to improve their ability to learn?
Song Juan
- Over the past two days to complete the task which
- Follow the progress of the product, and urge members to complete the program of small development
- Alpha ready to sprint reply
- The next plan
- Beta ready to sprint, perfect applet
- The remaining task
- Beta ready to sprint
- problems at hand
- Less time, there are other tasks to complete the course, post-mission progress has slowed down
- Harvesting and questions
- Harvest: Recently though in a hurry but also very fulfilling
- Question: If you want to complete the task faster and better, I can do? (can!!!)
Hsu Yu-Mei
- Over the past two days to complete the task which
- Alpha sprint (6/6) blog writing
- Trying to complete other courses fall jobs
- The next plan
- Beta ready to look at Saturday's sprint and after the defense tasks
- The remaining task
- Get ready to reply and the next Beta of this Saturday's sprint
- problems at hand
- It owes more than a little work, and I feel ill at ease but do not want to start work
- Harvesting and questions
- Harvest: Alpha sprint to end, happy happy
- Wondering: how to cure yourself of procrastination do not owe casual work?
Zheng wood flat
- Over the past two days to complete the task which
- And his teammates completed a small program most of the pages and functions
- The next plan
- Optimized code, complete applet
- Preparation of Beta Alpha reply and the next sprint
- The remaining task
- Optimized code, improve function
- Preparation of Beta Alpha reply and the next sprint
- problems at hand
- Complete small procedure in a hurry, there are some pages feature has not been completed, the need to improve late
- Harvesting and questions
- Harvest: substantially completed initial results
- Doubt: there is no doubt
Wu Hao
- Over the past two days to complete the task which
- With teammates to complete the perfect page
- The next plan
- Perfect applet
- Alpha ready reply PPT
- Beta ready to sprint
- The remaining task
- Code optimization, improve applet
- Alpha and Beta sprint to prepare defense
- problems at hand
- PPT completion time is a little tight
- Harvesting and doubts
- Harvest: Alpha sprint basically completed, and become more idle time
- Wondering: How to make yourself as strong as his teammates?
Zhang Zheng
- Over the past two days to complete the task which
- Perfect page
- The next plan
- Perfect page optimization applets
- Beta sprint
- The remaining task
- Perfect page optimization applets
- Beta sprint
- problems at hand
- No difficulty, improve the process went smoothly
- Harvesting and questions
- Harvest: About a deeper awareness of the applet
- Question: How can we better depth study of small programs?
吴崎
- Over the past two days to complete the task which
- Complete the remaining applet page
- The next plan
- Perfect perfect applet page
- Beta sprint
- The remaining task
- Debugging, optimizing, and improve small program
- Beta sprint
- problems at hand
- Some small program development operation is troublesome, the use of unskilled
- Harvesting and questions
- Harvest: Although more difficult but also probably completed development tasks applet
- Question: None
2. The latest results within the group
Increase access to micro-channel functional user name and avatar
The current state does not fight alone prompted
Increase collectively form a single fight
3. standup photo
4. Meetings consuming record
N-meeting | Consuming (minutes) |
---|---|
1 | 25 |
2 | 10 |
3 | 8 |
4 | 7 |
5 | 8 |
6 | 7 |
5. Personal PSP
PSP2.1 | Personal Software Process Stages | Estimated time consuming (minutes) | The actual time-consuming (minutes) |
---|---|---|---|
Planning | plan | 20 | 20 |
· Estimate | • Estimate how much time this task requires | 10 | 15 |
Development | Develop | 200 | 250 |
· Analysis | · Needs analysis (including learning new technologies) | 300 | 400 |
· Design Spec | Generate design documents | 50 | 50 |
· Design Review | · Design Review | 20 | 20 |
· Coding Standard | · Code specifications (development of appropriate norms for the current development) | 60 | 80 |
· Design | · Specific design | 100 | 150 |
· Coding | · Specific coding | 500 | 560 |
· Code Review | · Code Review | 30 | 35 |
· Test | · Test (self-test, modify the code, submit modifications) | 100 | 120 |
Reporting | report | 100 | 100 |
· Test repor | · testing report | 30 | 30 |
· Size Measurement | · Computing workload | 15 | 30 |
· Postmortem & Process Improvement Plan | · Hindsight, and propose process improvement plan | 20 | 50 |
6. Personal learning progress bar
N-Week | New Code (lines) | Cumulative codes (lines) | This week learning time-consuming (hours) | Cumulative learning time-consuming (hours) |
---|---|---|---|---|
1 | 200 | 200 | 10 | 10 |
2 | 100 | 300 | 3 | 13 |
3 | 50 | 350 | 1 | 14 |
4 | 50 | 400 | 1 | 15 |
5 | 30 | 430 | 1 | 16 |
6 | 20 | 450 | 1 | 17 |
7 | ||||
8 (Continued) |
| | |