This work belongs to the curriculum | Course Link |
Where the job requires | Requirements link |
Team Name | Big Chicken Italian team |
The target job | Design classroom attendance system, through the project development process to understand the specific APP, improve personal skills |
Member list
Full name | student ID |
---|---|
Lu Dong | 201831061228 |
Xu Peng | 201831061230 |
Lu Peng | 201831061308 |
Luo Fire wins | 201831061225 |
Luo Qingyun | 201831061227 |
LU Hai | 201831061224 |
Shuai | 201831061221 |
When using the prototype tool designed interface, the interface been set to scan code illegally interface as:
the effect after the change:
Other functional tests:
The α release complete content
The teacher can publish sign, sign way sign two-dimensional code, graphics rendering attendance, attendance, and so people can recognize
2. Leave function is perfect, the students leave to submit written request to the teacher counselor at
3. The teacher can see the usual student achievement
Unfinished function
1. Locate the sign did not finish
2. No complete the system automatically sends an alert message to the student's absences function
3. lack of appropriate experience, lack of interface design
β version of Outlook
1. The function of time and attendance system to be improved
2. Increased positioning check-ins
3. draw online attendance system, we have not thought of before increasing the function
detailed arrangement
Estimated time is four weeks
1. Leader convening of a full General Assembly, online learning and attendance system specific design features what, the head of the corresponding tasks for each person assigned
2. Every day people spend time correlation function of depth learn to lay the foundation for the further development of function after
3. the members of the group is divided into three parts, the part responsible for the development of teacher-related functions, part of the development of student-related function part, the other functional aspects of the design to leave
4. approaching the final cost week to complete the relevant functional testing