12. Switch Classification - Actual signaling - Optimization defined handover zone

  • Switching Category

  • Signaling the actual tracking station UE X2 and S1 at the tracking station

    is tracked from above the base station side

  • With switching

    excessively large (ping-pong handover), too small (dropped call), signaling storm path loss model is calculated from the
    transition zone: handover conditions are met, such as greater than 2db balance
    handover execution region: handover delay to ensure
    the protected area : after the handover, and then switch to prevent certain db, such as 2db
    actual: configuration together with a threshold. Experience by actual measurement, with switching and delay.

Guess you like

Origin www.cnblogs.com/sec875/p/11802881.html