Switching Category
Signaling the actual tracking station UE X2 and S1 at the tracking station
is tracked from above the base station sideWith switching
excessively large (ping-pong handover), too small (dropped call), signaling storm path loss model is calculated from the
transition zone: handover conditions are met, such as greater than 2db balance
handover execution region: handover delay to ensure
the protected area : after the handover, and then switch to prevent certain db, such as 2db
actual: configuration together with a threshold. Experience by actual measurement, with switching and delay.
12. Switch Classification - Actual signaling - Optimization defined handover zone
Guess you like
Origin www.cnblogs.com/sec875/p/11802881.html
Ranking