[Alpha] stage seventh week Scrum Meeting!
The object of the sixth week:
- The seventh meeting for the second week Scrum Meeting
- The meeting in the North launched 225 student apartments, full participation.
Team member | Last week tasks | To complete the task this week |
---|---|---|
Division was to make | Supporting his teammates to complete the task | Two blog burndown |
Qinhao | Andrews learning program code (progress ok) to determine the app name, "fish" https://github.com/Qin-Hao/SoftwareEngineering/issues/12 | Write app page and continue learning program code |
Qu Wei less | Procedural framework document (complete) https://github.com/Qin-Hao/SoftwareEngineering/issues/10 | Test documents |
Wang Zhen | UI interface making (completed) https://github.com/Qin-Hao/SoftwareEngineering/issues/11 | APP find the icon, written two weeks of the regular blog, submit blog jobs |
Meeting photo
Code or documentation to move:
About harvesting or difficulties encountered:
Wang Zhen: encounter some colors, such as navigation and menu selection interface design and other problems in the state when the UI design, and here I refer to the contents of small micro-channel programming guide: friendly and polite, clear, and easy elegance and other factors. Discuss together the final design of the interface is satisfied, then we wait and back-end students. Strive to make a great interface
Qinhao: could have been the beginning of the fifth week of the Alpha iteration, because our group is the National Day holiday from the start of the sixth week, so everything feels a bit hasty, our schedule is relatively backward and considering that we still learn while doing so we the task is very heavy, you have to refuel.
Qu Shao-wei: class diagram design complex, requiring repeated changes the relationship between brain function call runtime simulation program design.
Let me be more clear on the structure of the program, I have learned to write a structured document
Division was made: Summary need good time management, time spent arrange various subjects, each subject tasks done one by one
The good news place:
We are very positive, we will discuss problems encountered very harmonious. Although progress is slow but pretty slowly catching up!