The third work - prototyping

The third work - prototyping

Course Link https://edu.cnblogs.com/campus/xnsy
Work requirements https://www.cnblogs.com/harry240/p/11524127.html
Jobs goal Familiar with the requirements analysis, prototyping

Topics

Because schools do give an open experiment management system, time is tight, so the system will work as the practice

The overall system requirements

  • System Name: Students open experiment management system

  • The positioning system: to manage our school open test proprietary systems, operating modes to meet my real school management, interface and functionality required to meet the management needs of our school, unrelated and useless interface, buttons, options do not appear on the page.

  • Able to complete the test convenient and efficient open practice, project reporting, mid-term review, concluding acceptance, declare the results and statistics basic operations convenient and smooth; convenient to be able to related data query, modify, statistics, import and export and so on.
  • Have the results (text, tables, images, videos) publish and display functions
  • Notice, information dissemination, editing features. (announcement)
  • WORD and Excel and publish all information submitted as an attachment, the requirements can be submitted online, and modified online and save online.
  • Set the time window: allow students to topics window of time, school leaders project approval and concluding time window (declaration set time)
  • Set the number of project number project window (adjustable), control units do not break the number of plans submitted

The role and function assignment

Role Category: Leadership student, instructor, director of the laboratory, college, leadership functions, departments;

  • Students can fill in personal information online, query the list of projects may apply to participate in the school, to participate in the online application and view the application reply to limit their application to create, modify, amend and submit the online limit extracurricular experiments open university key project proposal (Project leader), may apply for an extension knot, concluding upload lab reports, upload results, audio, video, pictures, etc.

  • Instructor, online reporting, upload, edit, Southwest Petroleum University open experimental project application form, see the topics the students, the students selected to participate in the approval application or help the students on behalf of the election, to refuse the application (no reason), see your brought project approval , concluding the process and results, see the project team student information.

  • Laboratory director, summarized the experimental project open two units of the tube, apply for project approval, project by project plan, "extracurricular open pilot project Southwest Petroleum University project list" compiled by the system and "acceptance list of extracurricular open pilot project concluding Southwest Petroleum University" reported that two units of leadership for approval, view the results of the leadership and functional departments for approval and feedback.

  • College Leadership approval "extracurricular project open pilot project Southwest Petroleum University List" and "concluding acceptance of pilot projects open list of extracurricular Southwest Petroleum University" in the project, and the project and concluding material, see the results of functional departments for approval and feedback.

  • Departments develop annual units project plan (ie, the number of distribution lines and individual funds according to priorities and common projects), approval of the project (single and batch processing), viewing, downloading after two units of project approval and concluding material in the project , mid-term examination, concluding the process of feedback to the project instructor, project groups of students and director of the laboratory, and publish project results knot.

Project Module

Prototyping

Prototyping tools: axsure pr 9

  1. Background templates to build

  1. Native Design
  • login interface

  • Main interface

  • Project Application Interface

  • Fill in project application interface

  • Project Management Interface

  • Interface project approval

to sum up

The project needs a bit complicated, too much difficulty is related to the rights, different permissions corresponding responsibilities, the need to involve different functional modules for each permission, now only needs to have a rough idea after a simple analysis, planning No. roughly October is still a little difficult to complete the prototype design is relatively simple, behind the interface certainly have to rebuild, now expected to be completed in time around mid-November, after testing, and schools for the interface, and finally on the line

Guess you like

Origin www.cnblogs.com/humblezx/p/11599811.html