Pressure sensing step of step jmeter

First, set the test parameters

Figure

Number of Threads: Total number of threads together.

Ramp-UP Period (in seconds): How many seconds to complete all start threads.

loop Count: number of cycles

Scheduler: If you check, you can fill in the Scheduler Configuration, configuration time running the script.

Second, determine the number of threads that can be run pressure measuring machine

Number of Threads pressurized gradually, observing the response time measuring machine cpu pressure situation, and the jmeter.

When the pressure measuring machine cpu stable, with increased Number of Threads, JMeter response time gradually increases, the measured pressure reaches a bottleneck machines.

At this time, Number of Threads is the number of threads that can withstand pressure measuring machine.

Third, begin measuring pressure

According to the plan began to pressure test, use multiple processes (multiple jmeter) gradually pressurized to observe server performance is behaving as expected.

Guess you like

Origin www.cnblogs.com/featherw/p/11578876.html