Prototype Analysis: Requires text is accurate, clear style, illustrations (posted a prototype drawing), etc.
Prototype Model Design Tool
Axure Rp 9
Description of the process of twinning, to provide non-knot two shot put during the discussion, refinement and use special tools to prototype model photos
The PSP provides a knot on the job
PSP2.1 | Personal Software Process Stages | Estimated time consuming (minutes) |
The actual time-consuming (minutes) |
---|---|---|---|
Planning | plan | 30 | 24 |
· Estimate | • Estimate how much time this task requires | 30 | 24 |
Development | Develop | 1510 | 1730 |
· Analysis | · Needs analysis (including learning new technologies) | 600 | 780 |
· Design Spec | Generate design documents | 30 | 20 |
· Design Review | · Design Review | 30 | 10 |
· Coding Standard | · Code specifications (development of appropriate norms for the current development) | 10 | 10 |
· Design | · Specific design | 60 | 40 |
· Coding | · Specific coding | 360 | 300 |
· Code Review | · Code Review | 60 | 90 |
· Test | · Test (self-test, modify the code, submit modifications) | 360 | 480 |
Reporting | report | 90 | 90 |
· Test repor | · testing report | 30 | 30 |
· Size Measurement | · Computing workload | 30 | 30 |
· Postmortem & Process Improvement Plan | · Hindsight, and propose process improvement plan | 30 | 30 |
total | 1630 | 1844 |
This design provides a description of the job knot
Difficulties encountered and solutions
Difficult to describe (4 points)
attempts to resolve (4 points)
is resolved (2 points)
What is the gain (4 points)