APP test study notes (a): Test Process

  The test in this post has been working for more than a year, and for the work content of the test will now see the mind of the general test requirements, know what you are about to do. But a recent interview let me know your theory test is not good, there is a systematic process may help them better understand the work test to see there will be more problems at different levels of understanding.

The following content is the experience of other comrades study notes (text: https: //www.cnblogs.com/dengqing9393/p/6497068.html), I was again looking down the side of it will be more deep into the mind;,

1.2 test cycle

Test cycle project development cycle can be determined test time, the test time is generally twenty-three weeks (i.e., 15 days), may be appropriately shortened or lengthened depending on the project and the testing time quality version

1.3 Testing Resources

Before the test task starts, check the test resources

  • Product features required documentation;
  • Prototype drawing;
  • Product renderings;
  • Test Equipment;

1.4 Daily report that is the product line (internal reporting mechanisms)

 