[Personal use] Complete configuration process of Siemens s7-200 connection display and IoT box

Overview

1.PLC configuration
2.Display screen configuration
3.IoT box configuration

1. PLC configuration

1. Connect to PLC software

STEP-7MicroWIN V4.0 SP9 full version
link: https://pan.baidu.com/s/17LMEXnbkQZMPI8Bte24Eug?pwd=jsi3
Extraction code: jsi3

2.PLC configuration

Open the small cover on the PLC, turn the red button to the other end (ON), and turn on data collection

Insert image description here

Insert image description here

Connect PC and PLC using network cable

Insert image description here

3. Configure the network and download the program

When setting up the network, you should change the IP to 192.168.1.x, the default gateway is 192.168.1.1, and the subnet mask is 255.255.255.0

Insert image description here

Open the existing PLC program (find Baidu Netdisk, Xia Gong gave it)

Insert image description here

Communication -> Configure PLC IP in the 192.168.1.x network segment, refresh, then select and OK.

Insert image description here

File->Download->Click to download

Insert image description here
Insert image description here

2. Display configuration

1. Download display configuration software

EBpro software
link: https://pan.baidu.com/s/15wEVEIwjSmmKdsz5nQ-nBw?pwd=uuyi
Extraction code: uuyi

2.Touch screen configuration

Click the lower right corner and click the Settings button

Insert image description here

Configure IP address and subnet mask

Insert image description here

Find the MISC-2 mode (page adjustment does not depend on the point, just use next and pre), select the second option, and initialize the HMI. Then go all the way to next, then apply -> OK

Insert image description here

3. Set up the network and download the program

When setting up the network, the IP should be changed to 192.168.1.x (but not the same IP as the PLC), the default gateway is 192.168.1.1, and the subnet mask is 255.255.255.0

Insert image description here

Choose to use the network port, device name S7-200

Insert image description here

Select device from HMI as s7-200

Insert image description here

Select Download and set the touch screen IP to 192.168.1.98(Same as the IP just set on the touch screen)

Insert image description here

Program download successful

Insert image description here

3. IoT box configuration

1. Download the software and install it

Link: https://pan.baidu.com/s/1dyXQpvtFRLDQHZ38GZJcQA?pwd=d48gExtraction
code: d48g

2. Configuration steps

Enter the webpage: https://sukon-cloud.com/login
and use Xia Gong’s account and password (in the memo)

Insert image description here

After entering, select the left column project center -> add project

Insert image description here

Select "Copy Project" to copy the configuration of the previous project.

Insert image description here

Use Xia Gong's account to log in to the IoT box.

Insert image description here

Select the project we copied just now, such as "Test 1" -> Cloud Data Pulling. If you
don't understand, read the first tutorial: https://mp.weixin.qq.com/s/AbyWOSvHyFcUF5WDKR-PPw

Insert image description here
Double-click LAN and change the address to 192.168.1.x (but do not collide with the IP of the PLC and touch screen)

Insert image description here

Double-click HMI and set the IP to the IP of the touch screen

Insert image description here

Double-click the PLC and set the IP to the PLC's IP

Insert image description here

Configure the network and set the IP to 192.168.10.x (as long as it is not 192.168.10.100)

Insert image description here

Before downloading, please check again whether the IP of the LAN port has been changed to the 192.168.1.x network segment. Do not monitor direct downloads.
Please note! ! ! The next time you use a PC to connect to the BOX, you will no longer use 192.168.10.100. Instead, use the IP we just set for the LAN port: 192.168.1.75. The related IPV4 settings should also be changed to 192.168.1.x.

Insert image description here

IP used for first download:

Insert image description here

IP used for future downloads:

Insert image description here

4. Wiring the equipment and checking the debugging results

1. Wiring

The LAN1 port is connected to the PLC, and the LAN2 port is connected to the touch screen.

Insert image description here

2.

five,

1.

2.

Guess you like

Origin blog.csdn.net/qq_43768851/article/details/132626172