Foreword: When we first entered the company, the first step was to deploy the current company's projects. This blog is to introduce in detail how to deploy the current company's projects.

1. Development tools:

Two, specific steps:

2.1 Import the company's project

Open the eclipse development tools

2.2 Configure the current environment

1 An error is reported after importing, click buildpath

2 Here we configure and modify Tomcat, and change jre to be consistent with that installed on the computer.

3 After importing, we can see the items that already exist in the project

 4Modify the MySQL account and password

5 After the modification, run the project with additions, deletions, modifications and checks

2.3 Coding (similar to writing a CRUD)

Build entity from library

 dao method:

Modify the relevant SQL statement according to the existing

 Create action layer

 Custom mvc configuration

Summarize:


Foreword: When we first entered the company, the first step was to deploy the current company's projects. This blog is to introduce in detail how to deploy the current company's projects.

1. Development tools:

eclipse,jdk1.8,MySQL,Tomcat

Two, specific steps:

2.1 Import the company's project

Open the eclipse development tools

 

 

 

 

2.2 Configure the current environment

1 An error is reported after importing, click buildpath

2 Here we configure and modify Tomcat, and change jre to be consistent with that installed on the computer.

 

3 After importing, we can see the items that already exist in the project

 4Modify the MySQL account and password

5 After the modification, run the project with additions, deletions, modifications and checks

http://localhost:8080/mvc/blog.action?methodName=list

 

2.3 Coding (similar to writing a CRUD)

Start with entity, dao, web, servlet, jsp,

First create a database and use navicat to create fields

Build entity from library

 

 dao method:

Modify the relevant SQL statement according to the existing

 Create action layer

 Custom mvc configuration

 

Modify the corresponding jsp configuration

 

run

http://localhost:8080/mvc/teacher.action?methodName=list 

 

Test whether there are bugs. If everything is normal, then the deployment of a project is realized.

Summarize:

  1. Planning and preparation : Before the project is deployed, detailed planning and preparation work is required. Including determining deployment goals, assessing system requirements, developing deployment plans and timetables, etc.

  2. Environment configuration : When deploying a project, it is necessary to build and configure the corresponding environment. This includes hardware environment, operating system, database, network settings, etc. Make sure that each configuration meets the project requirements and can support the normal operation of the application.

  3. Software installation : According to project requirements, install the developed software into the target device. Selection and installation of versions, components and plug-ins is usually required. Make sure that the installation was error-free and compatible with other system components.

  4. Database settings : If the project involves a database, it is necessary to set up and configure the database. Including creating database instance, table structure design, data migration, etc. Ensure that the database can store and manage the data required by the project, and can provide efficient data access capabilities.

  5. Testing and verification : After the project deployment is completed, system testing and verification is required. Including functional testing, performance testing, security verification, etc. Ensure that the system can function normally according to the design requirements and can meet the needs of users.

  6. System optimization : In the process of project deployment, system optimization and adjustment are required. Including adjusting system configuration, optimizing database query, improving system performance, etc. Ensure that the system can run stably with high performance and reliability.

  7. Monitoring and maintenance: After the project deployment is completed, a monitoring and maintenance mechanism needs to be established. Regularly monitor the operating status of the system to find and solve problems in time . At the same time, formulate backup and recovery strategies to ensure the security and availability of system data.

  8. Documentation and training : After the project deployment is completed, corresponding technical documentation and operation manuals need to be written. At the same time, relevant personnel will be trained to master the operation and maintenance methods of the system. Ensure that the system can be effectively used and managed.

To sum up, project deployment is a complex and critical process. Sufficient planning, preparation and execution are required to ensure that the project can be successfully brought into service and meet the needs of users. At the same time, it is necessary to establish a sound monitoring and maintenance mechanism to ensure the stability and reliability of the system.