1. Software project planning process - all table collections

Table of contents

Planning Software Project Sheet

Estimated project cost and size table

Create a project schedule

Identify project risks and manage the schedule


Planning Software Project Sheet

stage Schedule Task
Project approval stage 1 week Define project scope, goals and requirements
planning stage 2 weeks Develop project plan, timetable and resource allocation, develop project management plan and risk management plan, etc.
needs analysis stage 3 weeks Conduct user demand research, analyze requirements, and formulate functional specifications and requirements documents
design phase 4 weeks Carry out outline design and detailed design, develop software architecture diagram and interface design documents
Coding and unit testing 8 weeks Start writing code, conduct unit testing, ensure code quality and stability
System testing phase 6 weeks Conduct system testing to test software functions, performance, security, etc.
Integration and Acceptance Phase 4 weeks Conduct integration testing and acceptance testing to ensure the software meets user requirements and quality requirements
Release and maintenance phase long Release software, perform maintenance and support, fix bugs and provide technical support
project management Work such as project management and progress tracking is required throughout the project cycle Manage project schedule, quality, cost and risk, etc. to ensure that the project is carried out according to plan

Estimated project cost and size table

Estimating project cost and size requires consideration of several factors, including but not limited to:

  1. Project size: The larger the project size, the higher the resources and costs required.

  2. Project type: Different types of projects require different resources and costs, such as software development, construction engineering, manufacturing, etc.

  3. Project Requirements: The complexity and frequency of change of project requirements can also affect cost and size.

  4. Project time frame: The tighter the project time frame, the more resources and costs are required.

  5. Project Team: Team size and member skills also have an impact on the cost and size of the project.

Based on the above factors, estimating project cost and scale requires detailed research and analysis, and the following methods can be used:

  1. Develop detailed project plans and requirements documents to clarify project goals, scope, time and quality requirements.

  2. Conduct market research and competitive product analysis to understand the cost and scale of similar projects.

  3. Communicate with suppliers and contractors regarding pricing and availability of relevant resources.

  4. Use cost estimation software and tools for estimation, such as PERT method, COCOMO model, etc.

  5. Conduct risk assessment and management, consider various risks and variables that may arise in the project, and make appropriate adjustments for project cost and scale.

In a word, estimating project cost and scale needs comprehensive consideration of multiple factors, detailed research and analysis, in order to formulate a feasible plan and budget.

Create a project schedule

To create a project schedule follow these steps:

  1. Determine project goals: Define the goals of the project and develop a project plan that will achieve those goals.

  2. Determine the scope of the project: Clarify the scope of the project and define the tasks, outcomes, deliverables, and exclusions of the project.

  3. Develop a work breakdown structure (WBS): Break down the project into smaller task units and determine the relationship between tasks.

  4. Determine project timetable: Based on the workload and timeline of tasks, develop a timetable and schedule for the project.

  5. Determine project costs: Based on the costs and schedule of tasks, develop a cost estimate for the project.

  6. Develop project risk management plan: determine project risk, develop risk management plan, including response measures and risk early warning mechanism.

  7. Develop a project resource plan: Determine what resources are needed, including human, material, financial, and technical support.

  8. Formulate project quality plan: determine the quality standards and evaluation methods of project results, and formulate a quality plan.

  9. Develop a project communication plan: Determine the communication needs and methods inside and outside the project.

  10. Formulate project execution plan: According to all the above plans, formulate the project execution plan, including project initiation, implementation, control and end.

The above are the general steps for formulating the project schedule, which need to be adjusted and refined according to the specific project situation.

A simple project plan form can contain the following sections:

  1. Project Name and Number: Record the name and number of the project for identification and tracking throughout the project.

  2. Project Overview: Outline the goals, scope and key requirements of the project so that the entire project team understands the basics of the project.

  3. Project Plan: Document the overall timeline of the project, including start date, end date, and milestones, so that the entire project team is aware of the project's progress and timelines.

  4. Responsible: Record the names and responsibilities of project team members so that accountability can be tracked and managed throughout the project.

  5. Task Checklist: List all the tasks for the project, and assign responsible persons and due dates for each task, so that tasks can be tracked and managed throughout the project.

  6. Progress Reporting: Documents the variance between the actual and planned progress of the project so that the entire project team is aware of how the project is progressing.

  7. Risk Management: Documenting the risks that may arise in the project and the countermeasures to manage and control the risks throughout the project.

  8. Problem Solving: Document problems and solutions that arise during the project so that problems can be managed and resolved throughout the project.

  9. Milestones: Record important milestones in the project so that the entire project team knows the important time nodes of the project.

  10. Cost Management: Document cost estimates and actual costs for projects so that the entire project team understands the cost status of the project.

The above is the basic structure of a simple project plan table, which can be adjusted and modified according to the needs of the actual project.

Identify project risks and manage the schedule

The following is an example of a possible project risk and management schedule:

risk Influence possibility management plan
technical challenge Delays in project progress high Set aside a certain amount of time to solve technical difficulties and establish backup plans
staff turnover lack of human resources middle Deploy staff ahead of time and establish backup plans
change of requirements Affects project direction and schedule middle Establish a change management mechanism to evaluate and process change requests in a timely manner
Supplier fails to deliver on time Delays in project progress middle Establish a good communication mechanism with suppliers, follow up the supply situation in time, and establish a backup plan
Insufficient budget project could not be completed high Establish a budget monitoring mechanism, adjust the budget in a timely manner, and find other sources of funds

In terms of management planning, the following measures can be considered:

  • Establish a risk management plan to identify, evaluate, avoid, and transfer risks;
  • Establish a change management plan to standardize the management of requirements changes to ensure that changes will not have an excessive impact on the project direction and progress;
  • Establish a quality management plan to standardize the quality management of project products to ensure that the deliverables of the project meet the quality requirements;
  • Establish a progress management plan to standardize the progress of the project to ensure that the project is completed on time and with quality;
  • Establish a communication management plan to ensure smooth communication within and outside the project team so that problems in the project can be discovered and resolved in a timely manner;
  • Establish a budget management plan to standardize the management of the project budget to ensure the effective use and control of the budget.

The project risk and management plan structure generally includes the following aspects:

  1. Project risk identification and classification: including identification and classification of various risks that may be faced in the project, such as technical risk, financial risk, human resource risk, etc.

  2. Risk probability assessment and impact analysis: conduct probability assessment and impact analysis on identified risks in the project to determine their possible impact and severity.

  3. Risk response strategy: According to the risk assessment results, formulate corresponding risk response strategies, including risk avoidance, transfer, mitigation and acceptance, etc.

  4. Risk management plan: On the basis of risk response strategies, formulate specific risk management plans, including risk monitoring, assessment and control, etc.

  5. Project change management plan: predict and manage possible changes in the project, and formulate corresponding change management plans to ensure that the progress and quality of the project will not be affected.

  6. Project quality management plan: formulate project quality standards and quality assurance measures to ensure that the project reaches the expected quality level.

  7. Project communication management plan: formulate internal and external communication and information transmission strategies of the project to ensure that the interests of all aspects of the project are fully guaranteed and coordinated.

  8. Project resource management plan: formulate project resource allocation and management strategies, including human resources, material resources, financial resources, etc., to ensure project resource utilization efficiency and cost control.

The above are the contents of some common project risk and management schedule structures, which can be adjusted and supplemented appropriately according to specific project conditions.