PS substitution and verification, you have read Tuanzijun’s article " Learning SAP PS with Tuanzi: Validation & Substitution Example Teaching ", I believe you have 360 degree mastery of project substitution and verification There are no dead ends.
Therefore, for standard fields (including several PRPS-USRXX user fields that are more useful than actual functions) business and configuration level science popularization, the idlers will no longer increase the burden on everyone's eyes.
Focus on how to use OPSN and OPSI for enhanced fields.
1. Enable the enhanced field of WBS screen. There is standard export CNEX0007. The code will not be posted, the old-fashioned enhancement, you can find "keywords, WBS screen enhancement fields" on the Internet.
Second, check OPSN, whether you can select the enhanced field (this is nonsense, if there is, there is no need to write this article)
3. Add the enhanced field to the replaceable field
1. Open the table VWTYGB01 SM30
2. Add the field
3. Add the field to
PS: Do you want to play as you like? The answer of the idler is: low-key, when the WBS structure is extremely large, use it with caution!
For example, ***a project definition*** of this order of magnitude***