Idle Talking PS #3-Pure Technology_Project Enhanced Replacement and Verification of Screen Fields

PS substitution and verification, you have read Tuanzijun’s article " Learning SAP PS with Tuanzi: Validation & Substitution Example Teaching ", I believe you have 360 ​​degree mastery of project substitution and verification There are no dead ends.

Therefore, for standard fields (including several PRPS-USRXX user fields that are more useful than actual functions) business and configuration level science popularization, the idlers will no longer increase the burden on everyone's eyes.
Focus on how to use OPSN and OPSI for enhanced fields.

1. Enable the enhanced field of WBS screen. There is standard export CNEX0007. The code will not be posted, the old-fashioned enhancement, you can find "keywords, WBS screen enhancement fields" on the Internet.
Insert picture description hereInsert picture description hereSecond, check OPSN, whether you can select the enhanced field (this is nonsense, if there is, there is no need to write this article)
Insert picture description here
3. Add the enhanced field to the replaceable field
1. Open the table VWTYGB01 SM30
Insert picture description here
2. Add the field
Insert picture description here
3. Add the field to
Insert picture description herePS: Do you want to play as you like? The answer of the idler is: low-key, when the WBS structure is extremely large, use it with caution!
For example, ***a project definition*** of this order of magnitude***
Insert picture description here

Guess you like

Origin blog.csdn.net/weixin_47375646/article/details/111978373