Those market rumors about the CMMI

I wrote the ten questions in front of CMMI in China, giving the impression that CMMI-based improvement in the coefficient of difficulty are high. I think an important reason is that many heretical CMMI rumors become mainstream, so many bosses, process improvement, quality, project managers, engineers have deviation.
The reason is nothing more than rumors prevailing model little knowledge, then I do not know where to put far-fetched to assume that through our concerted efforts, so that these rumors became seemingly fact. I have more than once come across the following list of rumors, every effort had to spend some explanation.
A rumor: CMMI explicitly given the requirements of good product development process
which is totally imaginary ah! CMMI model, year and SEI CMMI Institute today do not have to ask anyone to do anything. CMMI process improvement model is a guide, a clear process model of practice is not a step, it gives the organization by doing what recommendations to improve process capability, as to how to do that is entirely their own closed, if the shoe fits only know of foot.
Rumors II: ability to develop high-level CMMI organization is stronger than the low-level
Although some of the data collected show that year SEI ability to process high-level organization is better than the low-level, such as peer review efficiency. But in fact, these data have significant limitations, we can not verify this rumor. Many other factors will affect the ability to develop an IT organization. When an organization's main purpose is to improve the time to get a certificate, even if it passed the five assessment, process capability and perhaps still very dregs.
Rumors three: five by CMMI project organization must be managed by the five required
CMMI five organizations must have some type of project is managed by the five, but the model and the Academy does not require that all projects must be five to manage. Here is a cost-effective (ROI) issues, I see Thor (the world's first five companies, completed the five most re-evaluation of the organization) small project management processes, CMMI even two total.
Rumors IV: CMMI assessment of the organization has not done, in general, the development process must be very confusing
I always believe that any business can survive and develop, it must have some reasonable internal organization, good engineering and management practices. When introducing CMMI, often overlooked is good practice within. As far as I know, the Chinese have not done the BAT CMMI assessment, but who can say their development process upset it?
Rumors Five: do CMMI can solve all the problems in product development of
this rumor is more like a daydream, in practice, there is no so-called process issues. Specific problems are human problems, the process is not a substitute for good leadership. CMMI can help the team have the ability to repeat the successful experience of the past, but let the team magically acquire new skills, and full of fighting spirit of the work, CMMI really can not ah!
T1
Rumors Six: each process area needs to have a corresponding organizational procedures, each needs to have a corresponding measure
which is the primary purpose of assessment is common practice, the consequence is that no one can string together these processes, leading to the actual project the so-called practices and processes each run of each line. Each item has a series of cost measure, if the model requires you to measure all process, I would say that this model can be thrown away.
Rumors seven: CMMI improvements that EPG thing, nothing to do with me
this is the most damaging rumors. Imagine, people never done a test to improve your testing process, do you think it fly?
Rumors eight: CMMI is very difficult to understand, there must be outside expert guidance
this rumor thing? Oh, I actually really do not want to break ••• When a holding CMMI expert guide you every day, but do not spend energy to go deep into the project in question, do you need to consider substitutions?
Rumors nine: CMMI appraiser and lecturer very powerful, will be able to solve our problems
let me practice a few years, then down gestures it! Otherwise, I'm sorry this rumor.
Rumors ten: CMMI CMMI assessment by the Institute will organize certificates
do not think appraiser certificate signed by the director of the Institute is issued, it was just personal behavior. Institute certificate was not issued yet, but will not be certified five companies have five capabilities.
Rumors eleven: CMMI evaluation team members must have an internal or external members to participate in
the purpose of this assessment and the related evaluation methods there are some gray areas, did not give a very clear requirement to assess the leader in its submission to the Institute materials, the need to give the group members consider the choice of assessment.
Rumors 12: assessment of less weakness three organizations to assess weaknesses better than many three organizations
some bosses put the number weakness (weakness) as an evaluation index, in fact, doing so would greatly reduce the assessed value. The number of weaknesses and process capability is not directly related, the key is what kind of weaknesses. An assessment we sort out several dozens of weaknesses, but I can responsibly say that this is an excellent CMMI business!
Rumors thirteen: assessment must be completed, and different levels of on-site assessment days are clearly required
number of days is and evaluation purposes, scope, size, relevant way, does not explicitly require. However, a detailed assessment program can display time is reasonable. Site assessment need not be a complete, but must end within ninety days, during which the evaluation team can go to the site several times.
Rumors 14: After the assessment, consulting firm for the Sponsor and team members can fill out assessments to evaluate the feedback form
this rumor violation of the assessment requirements, which belongs to a fraud! Can a red card penalty.
Rumors five: Director appraiser is to assess the role of
the Mody, explain a bit about. Lead Appraiser just a qualification, assessment is to evaluate the role of leader, but he (she) must be the director of the appraiser.
So a bunch of lists, at first glance, much like the counts listed. In fact, not so exaggerated, it is science, be discriminating it!
(Source: Old Cong lectern)

Released two original articles · won praise 0 · Views 2436

Guess you like

Origin blog.csdn.net/ipmc2017/article/details/104940852