TTStand acquaintance Series Three [Development]

Development function

In the equipment design stage for product development test program, during the commissioning phase, it can track the full-featured debugger, described as follows:

Click on Development button to enter project development interface

(1) New Project

 

Click the New Project button below the Project tab

 

Open Project

 

(2) Project tab interface after the project is opened as follows:

 

New Project: Create a new empty project.

Delete Project: delete an existing project.

NI Report: NI configuration parameters of this report the project, you can refer to the NI user's manual.

Project Name: The name of the current project.

Project Description: description of the current project.

Socket Number: current slot number of items tested, the default value of 1.

(3) MasterSequence tab

 

UUT test developed to provide this work area, the area contains tools, sequence file area, step editing area, region sequence, variable region, the implementation of operational area.

(4) Variant tab

 

Add Variant: Add a new Variant.

Edit Variant: modify existing Variant.

Delete Variant: delete existing Variant.

After finish adding Variant interface state can be set specific steps

  • l  As Master
  • l  Execute
  • l  Skip

 

FileGlobals state variables can be provided, as shown below:

 

(5) Result tab

Result into the interface as follows:

 

Import: Add an external database, view TTStand platform.

 

Export UUT Results: UUT Results Export current database data.

Export UUT Result Details: single UUT Result Details Export data from the current database is selected.

Refesh: Refresh the current data in the database.

Load All Step Results: loading the current database of all UUT Result Details data.

 