Title III Scrum sprint blog
First, the stand-up meeting
Day conference provides a picture of standing
Second, each person's work
member |
Completed work |
Tomorrow plans to complete work |
problems at hand |
Lin Jianfeng |
Initially completed the user interface |
Jump to button user interface design user information page of the user's information page |
|
Lu Junjian |
Assist style user interface |
Assist style user information page |
Inline styles and outreach priority matching style conflict |
Shi Jing Xian |
Home docking with complete cloud database |
Page and complete the user information database cloud butt |
And cloud database docking interface is asynchronous implementation, the difficulty of the operation is a bit big |
Rao Yuanxing |
Home design complete loss trick |
Micro-channel authorization achieve personal information |
|
Zhou Huilong |
Achieve Ads buttons |
Home UI insert a picture |
|
Liang Jingtao |
Achieve complete Home button |
Home goods classification settings |
|
Third, the project burndown
Fourth, the appropriate project procedures / modules of the latest (run) Screenshot
V. Code / document check-in records
Sixth, the daily summary per person
- Lin Jianfeng: beginning to get started, I feel a little difficulty with the more familiar later found thousand times.
- Shi Jing Xian: Today encountered during docking cloud database a bit difficult, but fortunately, later resolved; tomorrow, when information in a docking users do not have to spend so much time.
- Raoyuan Xing: page design and other teammates discussed with the look, exchange about design ideas, brainstorming, in fact, not that hard.
- Lujun Jian: not to the testing phase, it is everywhere along the way, by the way informed about the progress of other players.
- Zhou Huilong: Rating System and discuss setting button together to catch today's schedule.
- Liang Jingtao: because the previous players to our time a little late, so when the time to get a little drag, but in the end still do a good job.