Alpha 03 group sprint (4/4)

Team name: Inequality of

Leader blog

Job blog

Team project schedule

A crew: Zhang Yijie (Leader)

  • Over the past two days to complete the task:
    • Text / verbal description:
      • We developed a preliminary project plan, and began to learn some of the recommendations, search algorithm class
    • GitHub commit record:
      • No
  • The next plan:
    • Next week urging responsible for front-end crew quickly completed, and began writing the back end
  • Burndown chart:

  • What is left tasks:
    • Each module coding, testing, project management, pressed forward docking after each module is completed
    • Real test feedback optimization
    • According to the feedback optimization test
  • What are the difficulties encountered:
    • Players to develop software application is not skilled
    • Java no basis more players, we need a temporary self
    • Adjust the time schedule is more difficult
  • What have we learned and questions:
    • reward:
      • And his teammates can learn new algorithm with knowledge, knowledge database, he taught himself some knowledge about team management.
    • doubt:
      • Are some of the technical questions

Crew II: Lin Jiawei

Crew II: Lin Jiawei

  • Over the past two days to complete the task:
    • Text / verbal description:
      • Completed the construction of the database
      • Learn how to build interactive web framework and the front and rear ends
    • GitHub commit record:
      • No
  • The next plan:
    • Burndown chart:
    - implement the backend operation of the database, and display data back to the front end
  • What is left tasks:
    • Truly build Web framework
    • Python complete operation of the database
  • What are the difficulties encountered:
    • Courses pressure, more exams, lack of time
    • More practice, difficult to schedule
  • What have we learned and questions:
    • reward:
      • Learn python framework of Flask
    • doubt:
      • How to be resolved to complete the data loaded at the same time rendering interface

Members three: Wu Zhiyong

  • Over the past two days to complete the task:
    • Text / verbal description:
      • We developed a preliminary project plan, and began to learn some of the recommendations, search algorithm class
    • GitHub commit record:
      • No
  • The next plan:
    • The beginning of next week to prepare the database
  • What is left tasks:
    • Database development
    • Optimization algorithms
  • What are the difficulties encountered:
    • Selection Algorithm
    • There is no basis for java, the need for temporary self-study
    • Adjust the time schedule is more difficult
  • What have we learned and questions:
    • reward:
      • Learning a new algorithm knowledge, knowledge database
    • doubt:
      • Are some of the technical questions

Members four: Yeung Kam Bin

  • Over the past two days to complete the task:
    • Text / verbal description:
      • Part of the development of the front end
    • GitHub commit record:
      • No
  • The next plan:
    • The complete front-end development
  • What is left tasks:
    • Left half of the front-end tasks
  • What are the difficulties encountered:
    • Front-end application development software is not skilled
    • Insufficient time
  • What have we learned and questions:
    • reward:
      • Learn about the development of knowledge about the front end of the
    • doubt:
      • Are some of the technical questions

Members five: Chen Rongjie

  • Over the past two days to complete the task:
    • Text / verbal description:
      • Understand the recommendations, search algorithm class
    • GitHub commit record:
      • No
  • The next plan:
    • Continue to write the back end
  • What is left tasks:
    • Implementation of the algorithm
  • What are the difficulties encountered:
    • Software development is not skilled to use
    • There is no basis for java, the need for temporary self-study
  • What have we learned and questions:
    • reward:
      • And his teammates can learn with new algorithms knowledge database knowledge.
    • doubt:
      • Are some of the technical questions

Members Six: Bao as ice

  • Over the past two days to complete the task:
    • Text / verbal description:
      • The front end of the message, a message, the Home page
    • GitHub commit record:
      • No
  • The next plan:
    • Learning Js, perfect interaction page
  • What is left tasks:
    • Front-end interface
  • What are the difficulties encountered:
    • Time to catch, interaction rough
    • Heavy load a little difficult to extract a lot of time
  • What have we learned and questions:
    • reward:
      • Use of htmlcss a better understanding of the
    • doubt:
      • Are some of the technical questions

Members seven: Liu Wang Yang

  • Over the past two days to complete the task:
    • Text / verbal description:
      • Understanding of the need to use the buttons and other plug-ins, trying to design.
    • GitHub commit record:
      • No
  • The next plan:
    • To complete the work as soon as possible is responsible for front-end
  • What is left tasks:
    • The front end portion of the coding, testing
  • What are the difficulties encountered:
    • The biggest difficulty is the lack of time, there are two exams this week
  • What have we learned and questions:
    • reward:
      • Front-end development for a better understanding and familiarity
    • doubt:
      • Still some technical questions

Members eight: Huang Binhuang

Over the past two days to complete the task:
writing / verbal description:
Learn some data before and after the end of the interaction, knowledge about Flask framework
GitHub check the record:

  • No
    next plan:
    have a problem to solve a
    what tasks left:
    continue to explore the problems encountered algorithm
    encountered what difficulties:
    more exams and assignments, time is really tight schedule
    What have you learned and questions:
    harvest:
    the case of using ajax algorithm successfully without changing pages, interact with the back-end, and the useful information recorded in the database
    question:
    can specifically talk about Flask in the framework of how the page is loaded on to interact with back-end get some information, and as the page is not rendered together? Js use it?

Crew Nine: Huang Zhifeng

  • Over the past two days to complete the task:
    • Text / verbal description:
      • No
    • GitHub commit record:
      • no
  • The next plan:
    • Burndown chart:
  • The next plan:
    • With the team to complete the preliminary design software
  • What is left tasks:
    • Development front page
    • Teammates with back-end connectivity
  • What are the difficulties encountered:
    • Not familiar with the new language
  • What have we learned and questions:
    • reward:
      • Master the skills of some of the front-end development
    • doubt:
      • Are some of the technical questions

Members ten: Su Kaiting

  • Over the past two days to complete the task:
    • Text / verbal description:
      • Completed the front-end part of the content writing
    • GitHub commit record:
      • No
  • The next plan:
    • Js add behavior to each page
  • What is left tasks:
    • Linked pages
    • Learn js
  • What are the difficulties encountered:
    • No
  • What have we learned and questions:
    • reward:
      • Html have done relatively quickly
    • doubt:
      • There are currently no doubt

        Crew XI: Wang Chin Shih

  • Over the past two days to complete the task:
    • Text / verbal description:
      • Learn some of the back-end knowledge
    • GitHub commit record:
      • No
  • The next plan:
    • Familiar with the interface and learn knowledge, implement the interface
  • What is left tasks:
    • Learn and achieve
  • What are the difficulties encountered:
    • Software development is not skilled to use
  • Interface type of project that may be required not know enough about
  • What have we learned and questions:
    • reward:
      • And everyone can learn together and progress together.
    • doubt:
      • They are

Showcase the latest achievements within the group

login interface

Search interface

Send a message

Personal Center interface

1 Shopping Cart Interface

Shopping Cart Interface 2

Shopping Cart Interface 3

Shopping Cart Interface 4

Recommended Books interface

1 setup interface

2 settings interface

Home

Book detail screen

I received orders

I'm under orders interface

Message interface

Change Password interface

Interface gift

Registration Interface

Standup photo:

Meeting time-consuming record table

N-meeting time consuming
1 10
2 8
3 8
4 8

psp table

PSP2.1 Personal Software Process Stages Estimated time consuming (minutes) The actual time-consuming (minutes)
Planning plan 10 20
Estimate Estimate how much time this task requires 5 5
Development Develop 10 10
Analysis Needs analysis (including learning new technologies) 60 50
Design Spec Generate design documents 0 0
Design Review Design Review 0 0
Coding Standard Code specifications (development of appropriate norms for the current development) 10 10
Design Specific design 10 15
Coding Specific coding 60 140
Code Review Code Review 10 10
Test Test (self-test, modify the code, submit modifications) 30 20
Reporting report 0 0
test repor testing report 0 0
Size Measurement Computing workload 0 0
Postmortem & Process Improvement Plan Later summarized, and process improvement plan 10 10
total 215 300

Learning schedule

N-Week New Code (lines) Cumulative codes (lines) This week learning time-consuming (hours) Cumulative learning time-consuming (hours) Important growth
12 200 2000 20 120 Learn html

Guess you like

Origin www.cnblogs.com/katy0308/p/11914694.html