The scrum sky garden within 2019.11.7 further for 10 minutes.
Participants: Zhikai Chen, Jia Ning, Jiyan He
leave: Xin Kang, Lihao Ran, Yongji Wu, Hao Wang
Individual work
Team member | To complete the task today | Tomorrow Scheduled Tasks |
---|---|---|
Zhikai Chen | Postquestionnaire complete getQuestionnaire and docking with the front end (id 83), write scrum report (id 91) | Designed and completed for the front end api, Jia Ning request the group data from the model back to the front end |
Jia Ning | Designing the questionnaire data entry and storage format (id 157), to complete the call api structure questionnaire database calls (id 76) | Design requirements of Recommendation api group model data storage format http request api and provides feedback to the user's data requests to the model group |
Hao Wang | ---- | And front-end test sandbox |
Reference links:
other problems
Next week's work is essentially complete interface and docking test, and may need the model group and the front and a large number of daily communication and discussion, we hope to complete as soon as possible, Chong Chong Chong!
Burndown
After burndown little change (awkward), modify the task more out of some of the remaining work.
Scrum
Code check
Today is a complete front-end code testing and Friday's docking with the model group discussions api doc's, no check in the code