Pair programming - four arithmetic

A, Github project Address: https://github.com/Littlehui3/rg2

Pair partner: Guoshao Hua

Two, PSP form

PSP2.1 Personal Software Process Stages Estimated time consuming (minutes) The actual time-consuming (minutes)
Planning plan 45 60
· Estimate • Estimate how much time this task requires 40 42
Development Develop 1090  1205
· Analysis · demand analysis  60 70
· Design Spec Generate design documents 35 40
· Design Review · Design Review  50 60
· Coding Standard · Code Specification 30 40
· Design · Specific design 80 85
· Coding · Specific coding 700  750
· Code Review · Code Review  45  55
· Test · Test (self-test, modify the code, submit modifications)  90  105
Reporting report  120  150
· Test Report · testing report  60  80
· Size Measurement · Computing workload  30  30
· Postmortem & Process Improvement Plan · Hindsight, and propose process improvement plan  30 40 
total    1255  1415

 

Third, the design process :