Abstract: "oracle 9i 10g subsequent upgrade - establish 10g oracle enterprise manager"
2009/6/21
Direct installation oracle 10g, and 9i default will create different management interface
Today, I want to try, but do not know how to start, after google big ask God to rebuild oem.
---------------------------------------------------------------------------------
Reference article: http://hi.baidu.com/terry_sky/blog/item/3ad0ac4b398650f583025c4a.html
---------------------------------------------------------------------------------
Basically job and reference articles, write it in the following simple procedure such operations.
The main command: emca (in the console directly into the environment may know how to use)
C:>emctl status dbconsole
EM Configuration issue. C:oracleproduct10.2.0db_A/PcOracle10g_ORACLEA not fo
and.
C:>emca -repos recreate
Start EMCA on 2009/6/21 02:45:08 PM
EM configuration assistance program, version 10.2.0.1.0 Production
Copyright (c) 2003, 2005, Oracle. All rights reserved.
Please enter the following information:
Database SID: oraclea
Listener port number: 1521
SYS user password:
SYSMAN user's password:
To continue [yes (Y) / no (N)]:? Y
2009/6/21 下午 02:45:31 oracle.sysman.emcp.EMConfig perform
Information: this job has been recorded in the C: oracleproduct10.2.0db_AcfgtoollogsemcaOracleAem
.log ca_2009-06-21_02-45-08- afternoon.
2009/6/21 下午 02:45:32 oracle.sysman.emcp.EMReposConfig dropRepository
Information: Deleting EM storage area (may take a little while) ...
2009/6/21 下午 02:45:36 oracle.sysman.emcp.EMReposConfig invoke
Information: storage area has been successfully deleted
2009/6/21 下午 02:45:36 oracle.sysman.emcp.EMReposConfig createRepository
Information: EM being established preservation area (may take a little while) ...
2009/6/21 下午 02:53:34 oracle.sysman.emcp.EMReposConfig invoke
Information: has successfully established storage area
Enterprise Manager configuration has been successfully completed
EMCA to complete 2009/6/21 02:53:34 PM
C:>emca -config dbcontrol db
Start EMCA on 2009/6/21 03:02:10 PM
EM configuration assistance program, version 10.2.0.1.0 Production
Copyright (c) 2003, 2005, Oracle. All rights reserved.
Please enter the following information:
Database SID: oraclea
Listener port number: 1521
SYS user password:
DBSNMP user's password:
SYSMAN user's password:
SYSMAN user password: E-mail address (optional) notice: [email protected]
Outgoing email notification (SMTP) server (optional): smtp.gmail.com
-----------------------------------------------------------------
You have specified the following set value
Database ORACLE_HOME ................ C: oracleproduct10.2.0db_A
Database Host name ................ PcOracle10g
Listener port number 1521 ................
Database SID ................ oraclea
E-mail address notification ............... [email protected]
Outgoing e-mail notification (SMTP) server ............... smtp.gmail.com
-----------------------------------------------------------------
To continue [yes (Y) / no (N)]:? Yes
2009/6/21 下午 03:05:44 oracle.sysman.emcp.EMConfig perform
Information: this job has been recorded in the C: oracleproduct10.2.0db_AcfgtoollogsemcaOracleAem
.log ca_2009-06-21_03-02-10- afternoon.
2009/6/21 下午 03:06:04 oracle.sysman.emcp.ParamsManager getLocalListener
Warning: An error occurred while retrieving PcOracle10g listeners
2009/6/21 03:06:09 PM oracle.sysman.emcp.util.DBControlUtil startOMS
Information: Starting Database Control (may take a little while) ...
2009/6/21 下午 03:06:59 oracle.sysman.emcp.EMDBPostConfig performConfiguration
Information: has successfully launched the "Database Control"
2009/6/21 下午 03:07:00 oracle.sysman.emcp.EMDBPostConfig performConfiguration
Warning: Unable to establish a "Database Control" shortcut
2009/6/21 下午 03:07:00 oracle.sysman.emcp.EMDBPostConfig performConfiguration
Information: >>>>>>>>>>> Database Control URL is http: // PcOracle10g: 1158 / em <<<<<<<<<<<
Enterprise Manager configuration has been successfully completed
EMCA to complete 2009/6/21 03:07:00 PM
Original: Big Box "oracle 9i 10g subsequent upgrade - establish 10g oracle enterprise manager"