It summarizes the work week. 2019.8 [2]

This week the focus is the end of the ink a little program project for a long time. Two days ago to solve critical issues still have to get up, and then the joint measurement test bug fix and some of the details of the optimization, the audit submitted by Thursday evening. Friday is assigned a new applet project tasks, people develop, the demand has been set, and to determine the effect diagram has a small front page program is a front-end staff development. Therefore, we determined the relevant design data table is assigned a number assigned interface.

This week necessary to sum up the place or many. Experience more profound are two points: First, the small micro-channel programs, developer tools effect on normal, real machine is not a normal situation all too common, and second, you have finished modifying your interfaces must be tested before submission, no matter how much time they have to determine their own at that modify certainly had no problem. But the test of truth is the only test program, then no matter how confident, be a little modest, honest to test again to ensure correct, and if at the time vowed to ensure that no problem, to the time when they used a bug, this is really his meow embarrassing ah!

Also this week, also take the time to read the next online search to some of the background management system, in some places very seductive, especially layui management background template, really very satisfied ah, but a fee to download. This weekend also saw under sweetalert plug, did not find the source code, can only refer to server on the other, a bit uncomfortable, but the solution really pop in the pc very beautiful ah.

Guess you like

Origin www.cnblogs.com/gds-1202b/p/11375109.html