Simulation tests 7

1, we promise that day convention
    n, m small, D is large, n, m, D condensing
    see data hit 30 DP, O (m ^ 2d)
    consider the actual sense, DP optimal manner and
    the number of combinations, the prefix and, tree line, a single team ......
    this problem with the first two.
    And transfer type prefix optimization, DP meaning to the actual effective number of days, and then into the D-day. Avoid duplication zero.
2, the day she left me
    a bool is 1 byte. Do not card often.
    Minimum Ring Type: Enumeration connected with the starting point as a breakpoint. Run dijk
    also stars A practice
3, one day she can come back to me
    Restrictions: Contact.
    Graph theory, edges, map links.
    Figure consider the implications of the construction.
    With different situations, for root DP, ring.
    Paul hit search points. Large yard first jump.
   

Guess you like

Origin www.cnblogs.com/seamtn/p/11223688.html