YARN knowledge

Copyright: original works https://blog.csdn.net/weixin_43093501/article/details/90211059

hadoop resource management system

yarn scheduler

Here Insert Picture Description

FIFO scheduler

  • The application placed in a queue, and then click Run
    drawback: if the first run large operations, in the back of the small jobs have been waiting for.

Capacity Scheduler

  • Prepared in advance to ensure that a small queue after job submission, you can run

Fair Scheduler

  • After the job is submitted, a part of the cluster allocation of resources from running jobs.

Guess you like

Origin blog.csdn.net/weixin_43093501/article/details/90211059