Computer completion project based on SSM shared power bank management system (including source code + thesis)


1 Project Introduction

Hi, everyone, this is Ms. M!

Today I would like to share with you a newly completed graduation design project this year (2022), [SSM-based shared power bank management system]

The senior sisters grade the project according to the difficulty and level of the realization (minimum 0 points, full score 5 points)

  • Difficulty factor: 3 points

  • Workload: 5 points

  • Innovation point: 3 points

  • Interface beautification: 5 points

Supplementary instructions for interface beautification: using vue can basically reach 5 points

This project will be completed in June 2022, including content: source code + thesis + defense PPT


2 to achieve the effect

Video URL: https://www.bilibili.com/video/BV1wa411973X

2.1 Interface display

  • Administrator login interface

insert image description here

  • User Management Interface

insert image description here

  • System function interface

insert image description here

  • bulletin board interface

insert image description here

3 design scheme

3.1 Overview

There are a lot of management and data storage involved in the shared charging treasure management system, such as administrators: home page, personal center, user management, maintenance personnel management, regional information management, cooperative merchant management, charging treasure delivery management, rental orders Management, return order management, fee order management, power bank maintenance management, bulletin board management, system management, maintenance personnel; home page, personal center, power bank placement management, rental order management, return order management, fee order management, power bank maintenance Management, users; home page, personal center, rental order management, return order management, fee order management, front home page: home page, cooperative merchants, charging treasure launch, bulletin board, personal center, background management. This has brought huge challenges to the work of managers. In the face of a large amount of information, the traditional management system uses notes to carry out detailed information statistics. On the computer, this method is more traditional, and it is troublesome to get statistical data information, and it is also affected by time and space. Therefore, a shared power bank management system has been developed to provide users with a convenient management platform, which is convenient for administrators to view and Maintenance, and can edit and maintain content according to requirements; for users, they can query the required information at any time, administrators can obtain system data information without leaving home, and it can save users a lot Time, so the development of a shared charging treasure management system has brought great convenience to the administrator, and it is also convenient for the administrator to process user information.

The database used in this system is Mysql, which is developed using SSM technology. During the design process, the system code is fully guaranteed to have good readability, practicability, easy scalability, versatility, easy maintenance, easy operation, and concise pages. .

3.2 System flow

3.2.1 System development process

The analysis of the system flow is to adjust and sort out the system design plan by investigating the identification, feasibility, operability, and system analysis and processing capabilities of the problems involved in the system to ensure that the system can reach the ideal state. These operations must focus on the registration and login to conduct a series of process tests to ensure the integrity of the database, so as to control the security of information management involved in the system and ensure the normal conversion of information input and output. Then, complete the drawing of the flow chart through practical operations.

The development of the shared charging treasure management system analyzes the management module and the database used by the system, writes codes, and tests the system.
insert image description here

3.3 System structure design

Structural diagram of shared power bank management system

insert image description here
System Structure Diagram

insert image description here

4 Item Acquisition

This project will be completed in June 2022, including content: source code + thesis + defense PPT

Guess you like

Origin blog.csdn.net/WEB_DC/article/details/131696132