2022 National Vocational College Skills Competition Higher Vocational Group Software Testing Competition Scoring Criteria

Task

Check point

Grading

Grading rules

Score

task one

Environment construction and system deployment

(5 points)

Environment construction and system deployment include construction and configuration of the test environment, installation and deployment of application systems, etc., screenshots of the process and results, and completion of environment construction and system deployment reports

1. Screenshots of test environment setup and configuration process and results

2

2. Correct screenshots of the application system installation and deployment process and results

3

task two

unit test execution

(10 points)

Write Java programs as required, design test cases, execute unit tests, and write unit test reports

1. Program source code

10

2. Test data and test method code

3. Screenshot of execution result

task three

Design Test Documentation

(15 marks)

Design test plan documents, clarify test scope, assign tasks reasonably and completely, formulate effective and complete test strategies, etc.

Test overview, test tasks, test resources, test plan, release criteria, associated risks

7.5

Design the test summary report document, review the test process, summarize the test situation, summarize the test conclusion, etc.

Test overview, test result documentation, test design, test review, use case summary, bug summary, test conclusion

7.5

task four

design test cases

(10 points)

Test cases include Web-side functional test cases, mobile App-side test cases, etc. The test case document should include: test case number, function point, use case description, precondition, input, execution steps, expected result, importance

1. Number of use cases. The score of each written test case = 2/number of use cases (there can be no repeated test cases, the writing must meet the requirements and be correct)

2

2. The number of key test cases. Every found 1 score = 7/number of key test cases (there can be no repeated test cases, the writing must meet the requirements and be correct)

7

3. Test case writing conforms to the test case specification

1

Execute test cases (15 points)

Bug submissions include web-side functional defects, mobile app-side defects, etc. Bug submission documents should include defect number, system under test, role, module name, summary description, operation steps, expected results, actual results, defect severity, submitter, screenshots, etc.

1. The number of bugs. Score for each bug found = 4/number of bugs (bug descriptions must be standardized and correct, repeated bugs are not included in the number of bugs)

4

2. The number of key bugs. Score for each key bug found = 10/number of key bugs (bug descriptions must be standardized and correct, repeated bugs are not included in the number of bugs)

10

3. The test Bug defect report list is written in compliance with the specifications, and each item needs to be filled in, otherwise 0 points

1

task five

Automated Test Execution

(20 points)

Automated test execution includes writing automated test scripts, executing automated test scripts, and completing automated test reports.

1. Terminology definitions and descriptions are clear

2

2. The first question is the correctness of the automated test script code

2

3. The second question is the correctness of the automated test script code

3

4. The third question is the correctness of the automated test script code

4

5. The fourth question is the correctness of the automated test script code

9

task six

performance test execution

(15 marks)

Performance test execution includes using performance test tools to record/add scripts, playback scripts, configure parameters, set scenarios, execute performance tests, take screenshots of test processes and results, and complete performance test reports.

1. Terminology definitions and descriptions are clear

1

2. LoadRunner test strategy description is clear

1

3. Screenshot of LoadRunner performance test implementation process

5.5

4. Fill in the LoadRunner execution results completely

0.5

5. Jmeter test strategy description is clear

1

6. Execution screenshot of Jmeter performance test implementation process

5.5

7. Fill in the Jmeter execution results completely

0.5

task seven

Interface Test Execution

(5 points)

Interface test execution includes setting with interface test tools, taking screenshots of the test process and results, and completing

Create an interface test report.

1. Terminology definitions and descriptions are clear

1

2. Screenshot of the implementation process of the first question interface test

2

3. The second question is the screenshot of the implementation process of the interface test

2

Professionalism

(5 points)

The competition site complies with the enterprise's "5S" (Sorting, Straightening, Cleaning, Cleaning and Quality) principles

1. The team division of labor is clear and reasonable.

2

2. Operating specifications.

2

3. Civilization competition.

1