Components are automatically brought out of the batch when the production order is placed

When the production order is placed, it is required that the materials with batches need to automatically bring out the batch information.

1. Create a condition table
The condition table is the combination of fields used in the batch search strategy, here according to the order type/factory/material

The definition process order condition table here should be: define process order condition table. It should be that there is a problem with the translation of SAP.
insert image description here
Click to create the condition form for batch determination
insert image description here
. Double-click the required field and save it.
insert image description here

2. Define the process order access sequence. If it is discrete manufacturing, select the production order access sequence
insert image description here
. Click Add to create a new access sequence, and then click Access to assign

insert image description here
Here, assign the previously created condition table to the access order
insert image description here
3. Define the sorting rules

Guess you like

Origin blog.csdn.net/u014469625/article/details/129931297