2. PSP
PSP2.1 | Personal Software Process Stages | Estimated time (minutes) | Actual time (minutes) |
---|---|---|---|
Planning | plan | ||
·Estimate | · Estimate how long the task will take | 10 | |
Development | develop | ||
·Analysis | · Requirements analysis (including learning new technologies) | 60 | |
·Design Spec | · Generate design documentation | 300 | |
·Design Review | Design review (review design documents with colleagues) | 60 | |
·Coding Standard | Code Specifications (to develop appropriate specifications for current development) | 60 | |
·Design | ·Specific design | 120 | |
·Coding | ·Specific code | 1200 | |
·Code Review | ·Code review | 200 | |
·Test | Testing (self-testing, modifying code, committing changes) | 300 | |
Reporting | Report | ||
·Test Report | ·testing report | 60 | |
·Size Measurement | · Computational workload | 30 | |
·Postmortem & Process Improvement Plan | ·Summary after the fact and propose a process improvement plan | 60 | |
total | 2460 |