Agile Sprint Three

1. Hold a stand-up meeting

This meeting is a short meeting after voting for excellent teachers.

1. A photo of the standing meeting on the day

2. Team member report

Lin Chuhong
Work done yesterday: Build a database Work
planned to be done today: The word learning interface can read the content displayed
in the database Difficulties encountered at work: Searching for the word library and how to classify it into simple, general and difficult

Dong Meifeng
The work completed yesterday: The interface of the button changing color is further improved
The work planned to be completed today: The connection and elimination of words
Problems encountered in the work: The server still cannot be connected

Lin
Yiru Finished work yesterday: Created a database in PHPMyAdmin yesterday, imported several pieces of data for use, and looked up word information on the Internet.
What is planned to be done today: The data import of the database and the game stop judgment are planned to be completed today.
Difficulties encountered in work: The main difficulty is in the construction of the server. The development of WeChat mini-programs has a great relationship with the server, and the database depends on the server.

Yang Xueying
Completed work yesterday: Part of the path selection code
Work planned to be completed today: Continue to work hard to connect to the server and improve the path selection code
Difficulties encountered in work: I don't know why the connection server keeps reporting errors, sad. . . Then the path code also reports an error.

Wang Huajun
The work done yesterday: Download and install the WeChat developer tool, read the official documentation, and operate a helloworld interface according to the WeChat applet tutorial . The work planned to be done today: imitating the difficulties encountered in
completing the two interface work: zero basis
, it's hard to start

2. Project Burndown Chart

Today, after the team members finished the button color change, they found that leangoo missed the task of the button color change, so the total number of cards in the burndown chart is one more than the total number of cards in the last burndown chart. Sorry for such an oversight.

3. Each person's code/document check-in record

1. Code check-in

  • Issue content and link corresponding to the check-in record, the code must be executable every day
  • code review coding specification documents to be updated at any time 5

    4. The latest (running) screenshot of the project program/module

    1. Code of the latest module

  • There are comments and specifications on the code

    2. Screenshot of the running result

    V. Summary

    Lin Chuhong

Yesterday was Sunday. There should have been more tasks to complete to reduce the work of the study day, but, physical test! body side! Taking four exams a day, just one 800 meters can make us weather-beaten juniors so tired that we just want to collapse on the bed. But my partner and I insisted on completing the planned tasks. Give us a round of applause. Today is study day. I don’t know if we can successfully complete today’s task. In addition, we need to find some information to read the data from the database to the WeChat platform.

Dong Meifeng
has been physically and mentally exhausted due to the physical test yesterday. I have completed relatively few things. I completed some relatively simple interfaces first. The purchased domain name has not yet been approved, and the authorization interface cannot be logged in. I don’t know if it is related to the domain name that is still under review. It’s really ideal and full, but the reality is very skinny. There are still many problems in the development process. The next few days keep working hard.

Lin Yiru
At present, my work progress is still slow, and I still have the previous problems. There has always been a problem with the platform construction, and I can't find a solution. Although the construction of the database is not difficult, the connection is a big problem, and the batch import of data is also a problem. Different tools have different operation methods. The progress of the work has lagged a little, and my ability is relatively weak. I have always been worried that it will drag the team back. Now I see less and less time, and I am nervous. Although I have completed a little task every day, but the overall is relatively slow, I hope I can gradually catch up.
Yang Xueying
Through her constant reading of the materials and constant testing, I finally know how to build a database on the service! happy. Work can also be handed off to members of the database creation. I was relieved, but I wasn't happy for long. I found that I couldn't connect to the server, which was really exhausting. After the body side is measured, people are very tired and do not want to write code. Then the connection server has been unable to connect, and the domain name has been under review. It can be said that there are various problems. Heart is congested.

After all, Wang Huajun
is the first time to contact WeChat applet development, and the Java foundation is not good. How to use the development tools is a big problem for me. In the next time, you should communicate with your teammates more, understand their ideas, and improve the efficiency of your own code writing.

Guess you like