Length of study
Excluding the busyness during the beginning of school and some holidays, it is about 100 days.
Gu target calculates about 14-15 weeks.
learning target:
Improve basic coding skills,
improve basic English and mathematics,
understand data structures and algorithms, and
strengthen physical fitness
Learning Content:
- 1. Data structure; 2. Advanced C; 3. Introduction to Algorithm; 4. English Writing and Recitation; 5. Foundation of Advanced Mathematics; 6. Foundation of Linear Algebra; 7. Long-distance Running;
-
Learning focus:
data structure:
1. Linear list;
2. Stack, queue, array;
3. Search and internal sorting;algorithm:
1. Recursion and divide and conquer strategy, backtracking method;
2. Greedy algorithm, branch and bound method, dynamic programming;Likou
1. Algorithmic questions;
2. Coding based on c language;English language
1. Try to write 170 words as much as possible to avoid the situation where one word appears many times in the text;
2. Memorize the words every week with dictation and listening and reading (dorms);mathematics
1. Relay problem dictionary 1800 maintains one section per week;
2. Synchronous review of advanced mathematics, linear algebra, probability and statistics;movement
Run at least 20 kilometers a week;
Learning output:
Odds and ends
1. Solve at least 7 questions
per week ; 2. Write a summary of algorithm understanding or data structure every week;
3. Write a big summary every month;
4. At least two pieces of 160-190 words per week English writing or translation of long articles (350 words-500 words), the subject is not limited;
5. Recite 160 words a week (from March 8);
6. Math relay problem dictionary one week a week;total
Calculated by 14 weeks:
- Force button: 98 questions
- Algorithm or data structure summary (more than 3000 words): 3 articles
- Summary of the learning phase (publication of learning results and evidence): 3 articles
- 160 words-190 words English composition or long text translation (350 words-500 words): 28 articles
- Word recitation: 2080 words (the specific start date is later)
- Relay question dictionary: complete to the linear algebra part-vector
- Sports: 260km long-distance running cumulative
Come on!
Painted on February 17, 2021, the second phase of the plan is expected to be launched before June 5