Record urge to learn 92

According to ISO / TC176 / SC2 (International Organization for Standardization / quality management and quality assurance technical committee / sub-committee Quality System) program of work, ISO9001: 2008 version of the standard will be officially released October 31, 2008 implementation.
Changes in the new 2008 standards
1, ISO9001: 2008 is the new standard is planned for October 31, 2008 officially released.
2, modify the standard less, no reason to "transition phase", ISO will use 6 to 12 months to the end of the ISO9001: 2000 version to use.
3, for most organizations, generally transition to the normal supervisory review, no additional time.
4, as long as the auditor of training at the new version can be modified.
5. The following provisions for the change:
3.0 Terms and definitions, the abolition of the supply chain. (Supply-side - Organization - the customer)
4.1 adds control over outsourced processes, outsourcing approach control by means of the method 7.4.1. Outsourcing does not reduce the responsibility of the organization to be undertaken.
4.2.1 Change a single file may include one or more program requirements, a requirement for documented procedure can also be embodied in multiple files. (Such as corrective and preventive management program)
4.2.3 adds 4.2.3f ensure quality system planning and operation of the necessary documents of external origin are identified and their distribution controlled.
5.5.2 Management representative: the new standard requires management representative should be a full-time or contract employees under the employee within the organization (not part-time).
6.2.1 based on education, training, skills and experience, the staff affect product quality compliance should be (larger range) competent.
6.2.2 Competence, awareness and training: evaluate the effectiveness of training required; to ensure that achieve the necessary capacity (refer to the actual operating capacity of tightened).
6.3 adds 6.3b: added support services (such as transport or communication or information systems / ERP systems planning, provision and maintain all aspects of evaluation.
7.2.1 Determination of requirements related to the product: an increase of post-delivery activities include the warranty terms and to fulfill the responsibility of the contract, such as maintenance services and ancillary services (such as recycling or final disposal).
7.3.3 design and development outputs Note added: production and services, including product protection (packaging - storage - handling - manual recovery).
Production and service provision 7.5.2 Validation of processes: clarify confirm the identity of the importance of the special procedures, special processes (such as welding, training, heat treatment, etc.) have a special project. (Eg: service, confirmed welders, drivers, engineers, school instrument's internal auditor)
7.5.4 Customer property: an increase of comment - to clarify intellectual property and private customer information (such as insurance companies, banks, etc.).
7.6 Monitoring and measuring devices: an increasing demand measured with the use of computer software (e.g., software test station's suitability for use software verification and configuration management).
8.2.1 monitoring the customer experience may include input from the following sources such as customer satisfaction surveys, product quality has been submitted information, user opinion surveys, lost business analysis, recognition, guarantee statements, sales reports.
8.2.2 Internal Audit: increase the scope of the audit records (such as internal audit program, attendance sheet, audit report, checklist, do not meet the reporting records).
8.2.3 Monitoring and measurement processes:
1) delete the last sentence, namely "to ensure conformity of the product."
2) increasing the annotation points to be considered when using the method of process control, this comment determination process is desired tissue consider when monitoring the application value measurement method. (That is, to increase the scope include: quality system for all processes).
8.3 Control of nonconforming product: No nonconforming product to meet customer requirements, customers get only agreed to release conditions can be released, the internal organization can not be released without obtaining consent of the client, such as the release does not meet the standard requirements, to open the main nonconformity

Published 131 original articles · won praise 9 · views 1938

Guess you like

Origin blog.csdn.net/jiganbz/article/details/103917530