First, the system environment
·
1, the system environment requirements
·
Test System environment: excellent Kirin 1910
·
2, the configuration software: Zijin bridge real-time cross-platform database V1.0.31 (Build 2020-03-16) (X64)
·
Second, the project manager
·
- ?????? user by Zijin bridge real-time cross-platform database development project called the project, all project users focus on the management of the unit by the Project Manager, including creating, modifying and saving. Usually the user when using the software, the need for various configurations, but also need to save a lot of settings, such as running the configuration screen, create various types of databases and spot IO collection connection and so on. The software will configure and setup information in the form of files stored on the hard disk. These collections according to different organizational structures generated file we call project, which holds all the information configured by the user.
· - ?????? The main function of Zijin bridge real-time database cross-platform project manager include: new construction into development, into the run, the search project, set to the default engineering, engineering backup and recovery project, delete engineering, software licensing, save the settings and exit projects. Zijin bridge real-time database cross-platform project manager interface content is clear, concise and friendly, this chapter will use the Project Manager toolbar and menu detail.
·····················
·Third, new construction
·
Real-time database using ·········· Zijin bridge cross-platform "Project Manager" to centralize the management of all engineering of the machine, such as a user
if you want to create a new project, you must first start "Project Manager . "
·
········· Project Manager toolbar icon to create a new project, click the Project Properties dialog box opens as follows:
···················· ·················
·
new construction steps are as follows:- In the Name text box, enter the name of the desired project, it is recommended not to use the Chinese name.
- In the "Description" can be entered in English content, as project notes or annotate content.
- Directly on the "path" edit box to specify the path or click the button to select the correct path. New work
time course, Zijin bridge real-time database cross-platform project will be given the default path, which is located in the software installation directory, the user
can make changes as needed Note: Do not use the Chinese name. - Click "ok" button, then you can find the work you just created in the "Project Manager" project list
process, which indicates success.
·
Fourth, into the development environment
·
After ············ Step 3 new construction is completed, click on to develop into the development environment.
·
············
····································· ············ configuration development environment
·
Because the development environment is very multi herein, this not be introduced.
·
① a new window
······································
·
Create a window named Win1
·
······························
·················· ·································· window properties
·
② create a modbus devices, meter data read modbus
·
· ·····················
·
···························· ·············· select modbus driver, new equipment yb1
·
·························
·
·· ·················································· · set ip and port
-
··························
·
················································· ?????? other parameters
·
click finish to complete the device configuration.
·
③ new database variables, read meter data
·················
·······················
·
········· ·············································· basic parameters defined
·
·······················
·
·························· ···························· alarm parameters
·
·················· ········
·
········································· ···················· IO connection
·
--------------------------- -
·
················································ ··········· history to save the settings
·
·
·································· ···················
····················
··········· ··········· bulk paste, the parameters of the new point will automatically continue , IO link will automatically incremented intelligence.
·
·
④ screen configuration
·························
Click on sub-················································ chart, choose instrumentation, add
········································
???? Double-click the instrument ················································ , bind variables
·
·
PS: child Turi all made use of the software configuration to achieve their function, the user can complete freedom and flexibility to create their own sub-graph.
·
·
..................
··················· ······································· add trend curve
········ ···············
··································· ························· curve parameter setting
·
according to the above manner, and then add an alarm assembly.
·
Add text to display the corresponding values on the screen
·
Fifth, run the project
···············
··································· ···························· operating results
*
Of course, the software supports viewing drive the message information to facilitate communication troubleshooting.
·················
·
real-time database DB information
··················
·
·
Fifth, cross-platform project
·
Fully compatible Engineering and Engineering under linux under ·········· Windows, interoperable.
..................
····················· ········ copy windows under the project "powerstation" to linux system
·
·
search and load the project
·················
·
·
into the project
??? ············
·
·
run the project:
·
·············
·············
?????? ............