How UML- painting operation contract?

1, in the preparation contract, before the discovery of the domain model does not, at this time if modifications are required?

You need to be modified. Comprising: a concept class, attributes, associations. This is the constant iteration and evolution

2, with the case of complex scenes, a state change of the details described in Example bloated due to excessive use, people could not stand, and therefore, this portion preferably contracts in the withdrawal operation.

3 Source:

 

 

4, using the past tense

Better: created XXX 
poor: Create a XXX or XXX is created

5, do not miss associate

6, examples

 

Guess you like

Origin www.cnblogs.com/yaoyuan2/p/10988259.html