A brief analysis of the software testing center’s test items and testing process, and obtaining CMA and CNAS software testing reports

Software testing is an essential step in the product cycle, which can better ensure software quality. So what are the test items generally included in software evaluation centers as we know them and what is the testing process? Let’s take a look below with the editor!Insert image description here

1. Test projects of the Software Evaluation Center

1. Functional testing: By simulating user usage scenarios, test whether the various functions of the software are normal and stable.

2. Performance testing: Evaluate the performance of the software under different loads by conducting stress testing, load testing, etc. on the software.

3. Acceptance testing: The last testing operation before deploying the software to ensure that the software is ready and can be used by end users to perform the intended functions and tasks of the software.

4. Compatibility testing: Test the compatibility of software under different operating systems and different hardware platforms to ensure that the software can run normally in various environments.

5. Security testing: Evaluate the security of the software and test possible vulnerabilities to ensure the security of the software.

6. Usability testing: Test the user interface, operation process, etc. of the software to evaluate the usability of the software.

2. Testing process of software evaluation center

1. Requirement confirmation: Fully communicate with customers to understand the functions, requirements and target users of the software.

2. Test plan formulation: Develop a detailed test plan, including test objectives, test scope, test strategy, etc.

3. Test case design: Design comprehensive test cases based on requirements and test objectives.

4. Test environment construction: Build a suitable test environment, including the configuration of software and hardware environments.

5. Execute test cases: Execute tests according to the test plan and test cases, and record the test results.

6. Defect management: record and track defects discovered during the testing process.

7. Test report writing: Based on the test results and evaluation, write a detailed test report and give improvement suggestions.

3. Obtaining CMA and CNAS software test reports

To obtain CMA and CNAS software testing reports, you need to choose a third-party software testing agency with these two qualifications, such as Zhuoma Testing. The testing team is professional and reliable, has a scientific management mechanism and a complete testing process, and provides various types of software testing nationwide. Software testing services, the third-party software testing reports issued are authoritative and effective.