How to crack the chaos of cabinet cables?

After a period of operation and maintenance of the integrated wiring system, the line connection information is basically in a state of confusion, and the line connection relationship can only be sorted out through on-site combing. The wiring between the cable chaos reflected in two aspects: visual and data, reason is mainly the lack of standardized ways of cable management and an appropriate means of changing the record .

Visual chaos and Insert picture description here
data chaos
Insert picture description here
How to choose a suitable cable organizer, standardize the cable management method, and crack the visual chaos of wiring?

In actual engineering projects, we often only configure the horizontal cable organizer instead of the vertical cable organizer, the side cable management ring, and the unreasonable binding method, which makes the subsequent jumpers difficult to tidy.

Error 1: Use cable ties to bundle jumpers. Jumpers will change frequently with business changes. Cable ties are a one-time product, which is not conducive to changing jumpers. At the same time, excessive bundling will also affect cable characteristics. The correct way is to use Velcro.
Insert picture description here
Error two: Only the horizontal cable organizer is configured, and the side cable organizer ring or vertical cable organizer is not configured. Jumpers need to be routed horizontally and vertically. Only a horizontal cable organizer cannot be used to sort the cables in the vertical direction. The correct way is to configure a horizontal cable organizer, a vertical cable organizer or a side cable management ring at the same time.Insert picture description here
Insert picture description here
Insert picture description here
Insert picture description here

Insert picture description here
What kind of recording method should you choose to record changes in wiring and crack the chaos of wiring data?

The chaos in the cabling data is more terrifying than the visual chaos. We don’t know the connection relationship between the lines and the problem is caused by the cable, which greatly delays our troubleshooting time, seriously affects the performance of operation and maintenance, and even causes artificial business interruption. .

Use EXCEL table or Visio diagram for cable and link document management? It is not intuitive, lacks process control, and tends to become more and more chaotic and eventually give up.

The correct way is to use visual integrated wiring management software to realize visual management of equipment and line resources, update line changes in real time, and keep wiring data accurate. Relevant link information can be found by locating any physically visible device, and relevant device port information can also be found by locating any piece of link information, using a 2D virtual visual environment to operate jumpers to form work orders or instructions to guide the scene Operation and maintenance personnel implement jumpers, complete the visualization of jumpers, ensure the real-time accuracy of all jumper connection information, and improve the efficiency of operation and maintenance management.
Screenshot of visual integrated wiring management software
Insert picture description here
Insert picture description here
The daily management of equipment loading and unloading and wiring is similar to our warehouse management. In order to realize the goods in and out of the warehouse, the warehouse must be made first and then out of the warehouse, always maintaining the accuracy of inventory information. Through the use of visual wiring management software, we plan resources, determine plans, and change records on the visual system, form work orders and implement them, so that the wiring information of the visual management software is always consistent with the actual site information, which greatly improves the operation and maintenance work effectiveness.
Comparison of cabling operation and maintenance management methods

Guess you like

Origin blog.csdn.net/NWVDI/article/details/109552675